FRA T3, MUC T1, BER pier-extension — ICAO Annex 14 OLS sets every crane.
Cross-border terminal-expansion workforce mobilisation against Frankfurt FRA T3, Munich T1 extension, BER pier-extension, Hamburg HAM expansion — ICAO Annex 14 OLS, EASA CS-ADR-DSN, Reg (EU) 139/2014 — on top of §14 AEntG and SOKA-BAU 20.2%.
Request Technical BriefingRegulator exposure profile
- ICAO Annex 14 OLS + LBA28%
- SOKA-BAU 20.2%26%
- §14 AEntG / SchwarzArbMoDiG24%
- EN 1090 EXC3 + BG-Bau22%
Obstacle limitation surfaces define every crane permit.
FRA T3 and MUC T1 expansion sit beneath an ICAO Annex 14 OLS envelope. EASA CS-ADR-DSN and Reg (EU) 139/2014 apply EU-wide; LBA approves Germany-specific deviations.
▲ Highest constraint · runway centreline
-
Inner horizontal surface
Above runway centre — strictest
- ICAO Annex 14 Vol I
- EASA CS-ADR-DSN
-
Conical surface
Sloping outward from inner horizontal
- Reg (EU) 139/2014
-
Approach surface
Off runway-ends · departure / arrival
- Off-end protection
-
Transitional surface
Sides of runway · lateral protection
- Lateral OLS
-
Terminal footprint
Outside OLS — standard cranes
- EN 1090-2 EXC3
- EN 1991-1-7 accidental
▼ Outside OLS · standard crane-permitting
Named projects in this jurisdiction
- Frankfurt FRA T3 (Fraport AG) Fraport AG 2026
- Munich MUC T1 extension Flughafen München GmbH
- BER pier-extension Berlin Brandenburg Flughafen Berlin Brandenburg
- Hamburg HAM Pier West Hamburg Airport
- Düsseldorf DUS Pier C expansion Flughafen Düsseldorf
Germany’s airport-terminal expansion programme runs primarily through Fraport (FRA T3), Flughafen München (MUC T1), and the smaller pier-extension programmes at BER, HAM and DUS. Every crane permit on these sites caps against the ICAO Annex 14 OLS envelope as transposed through EASA CS-ADR-DSN and the LBA approval.
01. Pre-pricing — BG-Bau + SOKA-BAU at every layer
Airport-terminal expansion is principally a construction-trade workforce: civil shell, EXC3/EXC4 structural steel, pier-extension concrete, baggage-handling infrastructure. BG-Bau carries employer-liability; SOKA-BAU 20.2% applies on the civil-trade portion at the West rate; Mindestlohn-Bau LG3 €23.97/h from 1 April 2026 carries the wage floor.
Where MEP scope predominates (HVAC, electrical, controls), BG-ETEM picks up the energised-work portion. Tarif-Bezug per Niederlassung is verified at mobilisation.
02. Meldeportal-Mindestlohn + A1 + airside access documentation
A1 + German-language contract + Meldeportal-Mindestlohn filing predate site arrival. The airport-specific layer adds the airside-access security clearance per worker — Sicherheitsüberprüfung under §7 LuftSiG, valid for the specific airport (not transferable across airports), and re-issued on personnel turnover. Per-worker fine ceiling under §23 AEntG: €30,000.
The crane-permit application links to the worker’s qualification: an operator outside the OLS-approved height range is rejected at the LBA stage, not at the site stage.
03. SOKA-BAU + BG-Bau onboarding
Civil-trade portion at 20.2% West rate. BG-Bau registers the workforce before site presence; the Baustellenausweis + airside-access clearance carry the determining classification.
04. SchwarzArbMoDiG-defensible evidence pack
Since 1 January 2026, FKS profile is biometric on-site + live payroll-IT + A1 / DRV / Meldeportal-Mindestlohn cross-matching. The airport overlay adds the airside-access register reconciliation. Minimum pack: SEPA-traceable remuneration, ArbZG timesheets, retrievable German-language contract, BG-Bau membership confirmation, Sicherheitsüberprüfung trail, and Anerkennung-recognition documentation.
05. India and Gulf sourcing corridors — the airport-expansion pathway
Indian airport-trade pool delivers Larsen & Toubro-trained airport-construction crews from the Mumbai T2, Delhi T3, Hyderabad and Bangalore expansion programmes. Gulf corridor reaches Saudi Binladin, ASGC, Arabtec airport-trade pools.
The 8 to 14-week corridor lead-time activates against Fraport FRA T3, Munich MUC T1, BER pier-extension, Hamburg Pier West or Düsseldorf Pier C; the Sicherheitsüberprüfung clearance is scheduled into the post-arrival window.