Skip to main content

Costed Plan
Before Commitment.

Scope Your Engagement
4-6 wk Engagement duration
48 hr Initial scoping turnaround
1 Costed deployment plan
0 Commitment to proceed
01/

Pipeline-Specific Scoping

The engagement is calibrated to a named lot — a specific Rahmenvereinbarung call-off, a specific tunnel section, a specific data-centre commissioning window. Generic capability scoping produces generic plans. Lot-specific scoping produces costed mobilisation schedules with named regulatory pathway, named source corridor, named sub-tier interface.

02/

Pre-Deployment Cost Model

Cost modelled at sectoral-tariff floor, not headline-Mindestlohn floor. ZVSHK Bayern, AVE Elektrohandwerk, IG Metall ERA, BRTV-Bau Lohngruppen, CAO Bouw & Infra, CAO Metalektro, IDCC 1702 — applied simultaneously where simultaneously binding. The cost line in the bid response matches the cost line in execution.

03/

Regulatory Path Selection

EU posting versus third-country sponsorship versus direct §18a/18b AufenthG hire — each pathway has distinct cost, timeline and audit posture. The engagement maps the candidate-set against the destination's recognition regime, the available bilateral social-security agreements, and the procurement-cycle critical path. Selection is justified, not assumed.

04/

Transferable Deliverables

Every engagement produces documented, transferable artefacts — pipeline cost model, regulatory pathway memo, source-corridor candidate profile, mobilisation Gantt with critical-path dependencies. The deliverables stay with the client whether a deployment follows or not. Capability transfer, not consulting dependency.

Scope Before Mobilisation

Paid scoping engagement against your specific pipeline. Proposal within 48 hours.

Start a Conversation