Costed Plan
Before Commitment.
Scope Your Engagement Costed plan before commitment.
Four to six weeks of structured scoping produces four transferable artefacts. The artefacts are yours regardless of whether the deployment proceeds.
-
Pipeline discovery + counterparty mapping
-
Regulatory pathway memo — per-jurisdiction
-
Source-corridor candidate profiling
-
Mobilisation Gantt + critical-path
-
Cost modelling — Tarif-Bezug verified
-
Final consolidation + handover
- Pipeline cost model Transferable
- Regulatory pathway memo Transferable
- Source-corridor candidate profile Transferable
- Mobilisation Gantt with critical-path Transferable
Pipeline-Specific Scoping
The engagement is calibrated to a named lot — a specific Rahmenvereinbarung call-off, a specific tunnel section, a specific data-centre commissioning window. Generic capability scoping produces generic plans. Lot-specific scoping produces costed mobilisation schedules with named regulatory pathway, named source corridor, named sub-tier interface.
Pre-Deployment Cost Model
Cost modelled at sectoral-tariff floor, not headline-Mindestlohn floor. ZVSHK Bayern, AVE Elektrohandwerk, IG Metall ERA, BRTV-Bau Lohngruppen, CAO Bouw & Infra, CAO Metalektro, IDCC 1702 — applied simultaneously where simultaneously binding. The cost line in the bid response matches the cost line in execution.
Regulatory Path Selection
EU posting versus third-country sponsorship versus direct §18a/18b AufenthG hire — each pathway has distinct cost, timeline and audit posture. The engagement maps the candidate-set against the destination's recognition regime, the available bilateral social-security agreements, and the procurement-cycle critical path. Selection is justified, not assumed.
Transferable Deliverables
Every engagement produces documented, transferable artefacts — pipeline cost model, regulatory pathway memo, source-corridor candidate profile, mobilisation Gantt with critical-path dependencies. The deliverables stay with the client whether a deployment follows or not. Capability transfer, not consulting dependency.