Skip to main content
SPAIN · HYPERSCALE DATA CENTRE

AWS Aragon €33.7 bn Mar 2026 + €15.7 bn May 2024, Microsoft Spain Central + €6.69 bn Zaragoza Mar 2025, Google Madrid europe-southwest1, Meta Talavera €1.03 bn 125 ha.

Cross-border hyperscale data-centre workforce mobilisation against AWS Aragon (Amazon Web Services; original 2021 €2.5 bn / 2022 operational + May 2024 €15.7 bn 2024-2033 + 2 March 2026 expansion to €33.7 bn total commitment supporting 17,500 jobs/yr in Spain; sites at Huesca, El Burgo de Ebro, Villanueva de Gállego, Zaragoza), Microsoft Spain Central Madrid region (San Sebastián de los Reyes + Algete + Meco; Azure cloud region launched June 2024 with three availability zones with Telefónica; part of $2.1 bn 2024-25 Spain commitment + additional Zaragoza campus announced March 2025 with €6.69 bn investment envelope), Google Cloud Madrid europe-southwest1 (operational May 2022; three cloud zones, partnered with Telefónica), Meta Talavera de la Reina Toledo (€1.03 bn 2024-30; 125 ha site; 300,000 m² at full build-out; first buildings operational 2026; full campus 2029; full capacity 2030), and Equinix Madrid MD1-MD6 Alcobendas campus (MD3 $185 m + MD4 $145 m + MD5 $118 m + $62 m pending; recognised as "Proyecto de Especial Interés" by Comunidad de Madrid June 2025) — REBT RD 842/2002 electrical safety + RD 337/2014 HV installations + CNMC grid + CTE + INSST + draft Royal Decree on data-centre energy efficiency.

Request Technical Briefing
€33.7 bn Mar 2026 AWS Aragon total commitment
$2.1 bn Microsoft 2024-25 Spain commitment
€1.03 bn / 125 ha Meta Talavera 2024-30
CNMC + INSST Spanish grid + work-safety

Regulator exposure profile

  • CNMC grid + REBT RD 842/2002 + RD 337/201428%
  • Convenio Colectivo Construcción + Cámaras24%
  • CTE + INSST24%
  • SEPE + agenciatributaria.gob.es24%

Named projects in this jurisdiction

  • AWS Aragon (Huesca + El Burgo de Ebro + Villanueva de Gállego + Zaragoza; operational since 2022 from original 2021 €2.5 bn plan; May 2024 expansion €15.7 bn over 2024-2033; 2 March 2026 expansion to €33.7 bn total commitment supporting 17,500 jobs/yr in Spain) Amazon Web Services 2026
  • Microsoft Spain Central Madrid region (San Sebastián de los Reyes + Algete + Meco; Azure cloud region launched June 2024 with three availability zones, built with Telefónica; part of $2.1 bn 2024-25 Spain commitment + additional Zaragoza campus announced March 2025 with €6.69 bn investment envelope) Microsoft 2024
  • Google Cloud Madrid region europe-southwest1 (operational May 2022; three cloud zones, partnered with Telefónica) Google LLC 2022
  • Meta Talavera de la Reina Toledo (€1.03 bn 2024-30; 125 ha site; 300,000 m² at full build-out; first buildings operational 2026; full campus 2029; full capacity 2030) Meta Platforms 2026
  • Equinix Madrid MD1-MD6 Alcobendas campus (operational; MD3 $185 m + MD4 $145 m + MD5 $118 m + $62 m pending; recognised as Proyecto de Especial Interés by Comunidad de Madrid June 2025) Equinix Inc.

Spain’s hyperscale cluster is the largest growth surface in Southern Europe: AWS Aragon (€33.7 bn raised 2 Mar 2026), Microsoft Madrid + Zaragoza (€2.1 bn + €6.69 bn Zaragoza Mar 2025), Google Madrid (since May 2022), Meta Talavera (€1.03 bn 2024-30), Equinix Madrid MD1-MD6. CNMC + REBT + INSST govern.

01. Pre-pricing — Convenio Colectivo Construcción

Construction-side workforce under Convenio Colectivo General del Sector de la Construcción. Spain-bank-traceable remuneration mandatory.

02. A1 + Spanish-language contract + REBT competency

A1 + Spanish-language contract predate site arrival. REBT RD 842/2002 + RD 337/2014 HV competence per electrical worker.

03. CNMC + INSST + AWS/Microsoft onboarding

CNMC grid-connection reconciliation. INSST safety-and-health-at-work compliance. AWS / Microsoft / Google / Meta / Equinix operator-specific Cx programme per worker.

04. SEPE + agenciatributaria-defensible evidence pack

Minimum pack: Spain-bank-traceable remuneration, Spanish-language contract, A1 receipt, Convenio Construcción tariff reconciliation, REBT competency record per electrical worker.

05. India and Gulf sourcing corridors — the Spain hyperscale-DC pathway

Indian cleanroom-fitters via Larsen & Toubro Construction + Gulf hyperscale-DC trades via Saudi Binladin / Arabtec. The 8 to 14-week corridor delivers Convenio Construcción-eligible candidates against AWS Aragon, Microsoft Zaragoza, Google Madrid, Meta Talavera, or Equinix MD1-MD6.

Same application, other jurisdictions

Scope your Spain Hyperscale Data Centre deployment.

Request a Technical Briefing