Skip to main content
ITALY · HYPERSCALE DATA CENTRE

Microsoft €4.3 bn Oct 2024 Lombardy, Aruba IT4 Rome 30 MW + IT3 Bergamo 60 MW, Data4 Cornaredo 67 MW, Vantage MXP2 €350 m Oct 2025.

Cross-border hyperscale data-centre workforce mobilisation against Microsoft Italy region (Milan/Lombardy cloud region launched 2023; €4.3 bn two-year expansion announced October 2024; new builds at San Bovio Peschiera Borromeo + Bornasco Pavia + Settimo Milanese MIL03 EIA May 2025), Aruba Hyper Cloud IT4 Rome Tecnopolo Tiburtino (74,000 m² campus; full build-out 30 MW; phase 1 operational) + Aruba Global Cloud IT3 Ponte San Pietro Bergamo (200,000 m²; 60 MW; Tier IV ANSI/TIA-942), Data4 Milan Cornaredo (67 MW electrical reserves; 7 operational data centres; €500 m expansion planned), STACK Infrastructure MIL01 Siziano (campus 27 MW across 3 buildings, rebranded Vaultica post-Apollo April 2025), and Vantage Data Centers Milan MXP2 Castelletto (€350 m investment, 32 MW IT capacity, first phase operational spring 2026; total €4 bn programme) — D.Lgs. 81/2008, ARERA grid concession, MASE EIA, Decree-Law 104/2023 Article 13 strategic-infrastructure status.

Request Technical Briefing
€4.3 bn Microsoft Italy Oct 2024
60 MW Aruba IT3 Bergamo
€350 m Vantage MXP2 Oct 2025
D.Lgs. 81/2008 Italian work-safety code

Regulator exposure profile

  • D.Lgs. 81/2008 + Cassa Edile28%
  • ARERA + MASE + EIA (VIA)26%
  • PC 124-equivalent CCNL Edilizia24%
  • Ispettorato + INAIL + INPS22%

Named projects in this jurisdiction

  • Microsoft Italy region (Lombardy; cloud region launched 2023; €4.3 bn two-year expansion announced October 2024; new builds San Bovio Peschiera Borromeo construction 2024-2027, Bornasco Pavia generators >50 MW in-construction, Settimo Milanese MIL03 EIA completed May 2025) Microsoft 2024
  • Aruba Hyper Cloud Data Center IT4 Rome (Tecnopolo Tiburtino; 74,000 m² campus; full build-out 5 buildings × 6 MW = 30 MW) Aruba S.p.A.
  • Aruba Global Cloud Data Center IT3 Ponte San Pietro Bergamo (200,000 m² campus; 60 MW; Tier IV ANSI/TIA-942) Aruba S.p.A.
  • Data4 Milan Cornaredo Campus (Via Monzoro 101-105; 67 MW electrical reserves; 7 operational data centres; Tier IV; €500 m expansion planned) Data4 Group
  • Vantage Data Centers Milan MXP2 Castelletto (€350 m investment; 32 MW IT capacity across two buildings, ~10,000 m²; first phase operational spring 2026; total €4 bn programme) Vantage Data Centers 2026

Italy’s hyperscale cluster centres on Microsoft Italy (Lombardy €4.3 bn expansion Oct 2024), Aruba IT3 Bergamo (60 MW) + IT4 Rome (30 MW), Data4 Milan Cornaredo (67 MW), STACK/Vaultica MIL01 Siziano, and Vantage MXP2 Castelletto (€350 m Oct 2025). Decree-Law 104/2023 Article 13 makes data centres strategic infrastructure.

01. Pre-pricing — CCNL Edilizia + Cassa Edile

Construction workforce under CCNL Edilizia + regional Cassa Edile (112 funds, CNCE national coordination). Italy-bank-traceable remuneration mandatory.

02. A1 + Italian-language contract + UNILAV notification

A1 + Italian-language contract predate site arrival. UNILAV pre-employment notification per Ispettorato Nazionale del Lavoro.

03. ARERA + MASE + Cassa Edile onboarding

ARERA grid-connection concession. MASE VIA permitting per facility. Cassa Edile regional registration per Niederlassung-equivalent province.

04. INPS + INAIL + Ispettorato-defensible evidence pack

Minimum pack: Italy-bank-traceable remuneration, Italian-language contract, A1 receipt, CCNL Edilizia tariff reconciliation, Cassa Edile attestation per worker.

05. India and Gulf sourcing corridors — the Italy hyperscale-DC pathway

Indian cleanroom-fitters via Larsen & Toubro Construction + Gulf hyperscale-DC trades via Saudi Binladin / Arabtec. The 8 to 14-week corridor delivers CCNL Edilizia-eligible candidates against Microsoft Lombardy, Aruba IT3/IT4, Data4 Milan, or Vantage MXP2.

Same application, other jurisdictions

Scope your Italy Hyperscale Data Centre deployment.

Request a Technical Briefing