Skip to main content
SPAIN · GREEN HYDROGEN ELECTROLYSER PLANT

Iberdrola Puertollano 20 MW operational 2022, Iberdrola Palos Huelva 200 MW + 370 MW Phase 1+2 €950 m, Cepsa/Moeve Andalusian Valley 2 GW €3 bn, H2Med BarMar PCI.

Cross-border green-hydrogen workforce mobilisation against Iberdrola Puertollano (operational since 2022; 20 MW PEM electrolyser; 100 MW PV solar; 20 MWh Li-ion BESS; 360 kg H₂/hr; €150 m investment; Fertiberia ammonia plant customer; inaugurated by King Felipe VI), Iberdrola Palos de la Frontera Huelva "Puerta de Europa" (Phase 1: 200 MW electrolyser + 23,000 t H₂/yr + €450 m; Phase 2: 370 MW + 39,100 t H₂/yr + €500 m+; Phase 1 target Q4 2025; IPCEI Hy2Use selected Sep 2022; BP partnership Feb 2025), Cepsa/Moeve Andalusian Green Hydrogen Valley (Palos de la Frontera Huelva + San Roque Cádiz; combined 2 GW electrolysis + 300,000 t H₂/yr; €3 bn H₂ + €2 bn renewables; Onuba first phase 405 MW Palos with €303.75 m MITECO grant; Huelva start-up 2026 + Cádiz 2027), and H2Med BarMar Barcelona-Marseille subsea pipeline (Enagás ES + NaTran FR + Teréga FR; FID scheduled 31 Dec 2026; COD 2030 some sources 2032; 455 km; 700-1050 mm; 144 MW Barcelona compressor station; 2 Mt H₂/y; EU PCI status renewed) — MITECO Hoja de Ruta Hidrógeno + IPCEI Hy2Use SA.103388/2022 + EU RFNBO Delegated Acts.

Request Technical Briefing
20 MW operational 2022 Iberdrola Puertollano
2 GW / €3 bn Cepsa/Moeve Andalusian Valley
€303.75 m grant Onuba Palos MITECO
H2Med 2 Mt H₂/y BarMar PCI 2030 COD

Regulator exposure profile

  • IPCEI Hy2Use + RD 681/2003 ATEX28%
  • MITECO + CNMC + EU RFNBO Delegated Act24%
  • Convenio Colectivo Construcción26%
  • TEN-E + CEF + INSST22%

Named projects in this jurisdiction

  • Iberdrola Puertollano Ciudad Real (operational since 2022; 20 MW PEM electrolyser; 100 MW PV solar; 20 MWh Li-ion BESS; 360 kg H₂/hr; €150 m investment; customer Fertiberia ammonia plant; inaugurated by King Felipe VI) Iberdrola 2022
  • Iberdrola Palos de la Frontera Huelva "Puerta de Europa" (Phase 1: 200 MW electrolyser, 23,000 t H₂/yr, €450 m; Phase 2: 370 MW, 39,100 t H₂/yr, €500 m+; Phase 1 target operational Q4 2025; IPCEI Hy2Use selected Sep 2022; BP partnership announced Feb 2025) Iberdrola + BP partnership 2025
  • Cepsa (Moeve) Andalusian Green Hydrogen Valley (Palos de la Frontera Huelva + San Roque Cádiz; combined 2 GW electrolysis; 300,000 t H₂/yr; €3 bn H₂ + €2 bn renewables; Onuba first phase 405 MW Palos with €303.75 m MITECO grant; Huelva start-up 2026 [full 2028]; Cádiz operational 2027) Cepsa (Moeve)
  • H2Med BarMar pipeline Barcelona-Marseille subsea (Enagás ES + NaTran FR + Teréga FR; FID scheduled 31 December 2026; COD 2030 some sources 2032; 455 km; 700-1050 mm diameter; 144 MW Barcelona compressor station; 2 Mt H₂/y capacity; EU PCI status renewed) Enagás + NaTran + Teréga 2026

Spain’s H₂ anchor is Iberdrola Puertollano (20 MW operational since 2022) + Iberdrola Palos Huelva “Puerta de Europa” (Phase 1 200 MW Q4 2025 + Phase 2 370 MW) + Cepsa/Moeve Andalusian Valley (2 GW + €3 bn) + H2Med BarMar pipeline (FID 31 Dec 2026; COD 2030). MITECO + IPCEI Hy2Use govern.

01. Pre-pricing — Convenio Colectivo Construcción

Process workforce under Convenio Colectivo Construcción. Spain-bank-traceable remuneration mandatory.

02. A1 + Spanish-language contract + ATEX competency

A1 + Spanish-language contract predate site arrival. RD 681/2003 Group IIC + Temperature Class T1 competence per H₂ zone worker.

03. MITECO + IPCEI Hy2Use + CNMC onboarding

MITECO Hoja de Ruta del Hidrógeno reconciliation. IPCEI Hy2Use grant disbursement per Iberdrola/Cepsa. CNMC grid-connection per facility.

04. Inspección Trabajo + INSST-defensible evidence pack

Minimum pack: Spain-bank-traceable remuneration, Spanish-language contract, A1 receipt, Convenio Construcción tariff reconciliation, RD 681/2003 ATEX competency record per H₂-zone worker.

05. India and Gulf sourcing corridors — the Spain H₂ pathway

Indian and Gulf H₂-process trade pools through Larsen & Toubro Heavy Engineering + ADNOC. The 8 to 14-week corridor delivers Group-IIC-competent candidates against Iberdrola Palos Phase 2 or Cepsa Onuba scale-up.

Same application, other jurisdictions

Scope your Spain Green Hydrogen Plant deployment.

Request a Technical Briefing