PEJ Lubiatowo-Kopalino Westinghouse AP1000 3 units first concrete Q4 2028 first ops 2036, PGE PAK Konin/Bełchatów post-KHNP withdrawal Aug 2025, OSGE Włocławek BWRX-300 Feb 2026.
Cross-border nuclear-build workforce mobilisation against PEJ Polskie Elektrownie Jądrowe Lubiatowo-Kopalino Choczewo Pomorskie (Westinghouse AP1000 3 units × 1,250 MWe gross; Westinghouse-Bechtel EPC consortium; construction licence application submitted to nuclear regulator 31 March 2026; EPC contract expected mid-2026; building permit application 2027; first concrete Q4 2028; first unit ops 2036; units 2/3 in 2037/2038; preparatory site works since 2025), PGE PAK Energia Jądrowa Konin/Bełchatów (second large NPP; KHNP withdrew August 2025; PGE acquired full ownership October 2025 from ZE PAK; APR1400 technology originally proposed 2× 1,400 MWe ~22 TWh/yr; final-site decision Konin vs Bełchatów targeted 2027; commercial operation from 2036; reactor technology not yet redecided post-KHNP withdrawal), and OSGE Orlen Synthos Green Energy Włocławek (Orlen S.A. + Synthos Green Energy 50/50 JV; GE Vernova Hitachi BWRX-300 SMR; Polish generic-design contract signed February 2026; first plant site Włocławek; site selection consolidated August 2025; fleet ambition 24 BWRX-300 units; first unit target 2032) — PAA Państwowa Agencja Atomistyki + Ustawa Prawo atomowe Dz.U. 2000 Nr 3 poz. 18 + Ustawa z 29 czerwca 2011 specustawa jądrowa Dz.U. 2011 Nr 135 poz. 789 + Euratom 2009/71 + 2014/87.
Request Technical BriefingRegulator exposure profile
- PAA + Prawo atomowe + specustawa jądrowa28%
- Euratom 2009/71 + 2014/87 + IAEA SSR-2/126%
- Układ Zbiorowy + BUDOWLANI24%
- Prawo budowlane + GUNB + BHP22%
PAA + per-station WPQR anchor every nuclear lot.
PEJ Lubiatowo-Kopalino + PGE PAK Konin/Bełchatów + OSGE Włocławek clearance pathways: PAA Prawo atomowe + Euratom 2009/71 + 2014/87 + ASME III / RCC-M / EN 13445 + IAEA SSR-2/1.
- 01 T-18mo
Clearance start
PAA security vetting + Art. 7 worker classification
- PAA
- Prawo atomowe Art. 7
- 02 T-12mo
Specustawa jądrowa
Ustawa o przygotowaniu inwestycji jądrowych Dz.U. 2011 Nr 135 poz. 789
- Specustawa jądrowa
- Polish Nuclear Programme
- 03 T-6mo
WPQR scope
Per-station welder qualification
- EN ISO 9606-1
- ASME III
- RCC-M
- 04 T+0
On-site work
PAA-supervised construction
- PAA
- Westinghouse-Bechtel / GE Vernova Hitachi
- 05 T+8wk
Demob
Handover + post-work assurance
- PAA protocol
Named projects in this jurisdiction
- PEJ Polskie Elektrownie Jądrowe Lubiatowo-Kopalino Choczewo Pomorskie (Westinghouse AP1000 3 units × 1,250 MWe gross; Westinghouse-Bechtel EPC consortium; construction licence application submitted to nuclear regulator 31 March 2026; EPC contract expected mid-2026; building permit application 2027; first concrete Q4 2028; first unit ops 2036; units 2/3 in 2037/2038; preparatory site works since 2025) PEJ (Polskie Elektrownie Jądrowe sp. z o.o.) + Westinghouse + Bechtel 2026
- PGE PAK Energia Jądrowa Konin/Bełchatów (second large NPP; KHNP withdrew August 2025; PGE acquired full ownership October 2025 from ZE PAK; APR1400 technology originally proposed 2× 1,400 MWe ~22 TWh/yr ~12% Polish electricity demand; final-site decision Konin vs Bełchatów targeted 2027; commercial operation from 2036; reactor technology not yet redecided post-KHNP withdrawal) PGE PAK Energia Jądrowa 2025
- OSGE Orlen Synthos Green Energy Włocławek (Orlen S.A. + Synthos Green Energy 50/50 JV; GE Vernova Hitachi BWRX-300 SMR; Polish generic-design contract signed February 2026; first plant site Włocławek; site selection consolidated August 2025; fleet ambition 24 BWRX-300 units across multiple sites; first unit target 2032) OSGE (Orlen S.A. + Synthos Green Energy JV) + GE Vernova Hitachi 2026
Poland’s nuclear pipeline anchors PEJ Lubiatowo-Kopalino (Westinghouse AP1000 3× 1,250 MWe; construction licence application 31 Mar 2026; first concrete Q4 2028; first ops 2036), PGE PAK Konin/Bełchatów (KHNP withdrew Aug 2025; reactor not yet redecided; PGE full ownership Oct 2025), and OSGE Włocławek (Orlen-Synthos BWRX-300 SMR; design contract Feb 2026; first unit 2032). PAA + Prawo atomowe + specustawa jądrowa govern.
01. Pre-pricing — Układ Zbiorowy + EN ISO 9606-1 WPQR
Construction + pressure-part workforce under Układ Zbiorowy + BUDOWLANI + EN ISO 9606-1 WPQR + ASME III / RCC-M / EN 13445 per-station scope.
02. A1 + Polish-language contract + PAA clearance
A1 + Polish-language contract predate site arrival. PAA radiation-worker classification (Art. 7 Prawo atomowe; 12-18 month lead-time) per radiation-zone worker.
03. PEJ / PGE PAK / OSGE onboarding
PEJ + Westinghouse-Bechtel (Lubiatowo) or PGE PAK Energia Jądrowa (Konin/Bełchatów) or OSGE + GE Vernova Hitachi (Włocławek) operator-specific induction per gang.
04. PIP + PAA-defensible evidence pack
Minimum pack: Poland-bank-traceable remuneration, Polish-language contract, A1 receipt, Układ Zbiorowy tariff reconciliation, PAA authorisation + WPQR scope-match per nuclear-station welder.