Doel + Tihange LTO under Engie-Belgian accord; ONDRAF/NIRAS Dessel; SCK CEN MYRRHA.
Cross-border nuclear-construction workforce mobilisation against Doel 4 + Tihange 3 long-term-operation extension to 2035 (under Engie-Belgian government accord; phase-out partly reversed), Doel 1/2/3 + Tihange 1/2 phase-out monitoring, ONDRAF/NIRAS Dessel near-surface disposal facility for Category-A waste, and SCK CEN Mol BR2 + MYRRHA research reactors — FANC/AFCN federal licensing, Bel V technical subsidiary.
Request Technical BriefingRegulator exposure profile
- FANC/AFCN + Bel V + ONDRAF/NIRAS30%
- Loi 15 avril 1994 (nuclear sector)24%
- Limosa-L + §30bis + SIOD22%
- PC 124 BTP + PC 111/20924%
LTO extension + decommissioning + research-reactor pathway.
BE nuclear strategy: Doel 4 + Tihange 3 LTO to 2035; Doel 1/2/3 + Tihange 1/2 phase-out; ONDRAF/NIRAS Dessel waste-disposal under construction; SCK CEN MYRRHA in development. FANC/AFCN federal licensing.
- 01 2025
Doel 4 + Tihange 3 LTO accord
Engie-Belgian government agreement for 2-reactor extension
- Engie Electrabel
- FANC/AFCN
- 02 2025-2035
Doel 1/2/3 + Tihange 1/2 phase-out
Decommissioning preparation + spent-fuel handling
- Bel V
- ONDRAF/NIRAS
- 03 2026-2030
ONDRAF/NIRAS Dessel
Near-surface disposal facility (Category-A waste)
- ONDRAF/NIRAS
- Belgoprocess Dessel
- 04 2026+
SCK CEN MYRRHA construction
Research reactor development at Mol
- SCK CEN Mol
- BR2 + MYRRHA
- 05 2035+
Doel 4 + Tihange 3 post-LTO
Decommissioning + Dessel disposal completion
- LTO completion
- Final dismantling
Named projects in this jurisdiction
- Doel 4 + Tihange 3 LTO extension to 2035 (Engie-Belgian government accord) Engie Electrabel 2035
- Doel 1/2/3 + Tihange 1/2 phase-out monitoring Engie Electrabel
- ONDRAF/NIRAS Dessel near-surface disposal facility (Category-A waste) ONDRAF/NIRAS
- SCK CEN Mol BR2 research reactor + MYRRHA development SCK CEN
- Belgoprocess Dessel — waste treatment / storage operator Belgoprocess
Belgium partly reversed its nuclear phase-out: Doel 4 + Tihange 3 LTO to 2035 under the Engie-Belgian government accord. Doel 1/2/3 + Tihange 1/2 remain on phase-out. ONDRAF/NIRAS Dessel + SCK CEN Mol MYRRHA are the headline construction projects.
01. Pre-pricing — PC 111/209 + PC 124
Process workforce under PC 111/209 metal-trade CBAs + nuclear-trade premium per Engie. Civil shell at PC 124 BTP.
02. Limosa-L + A1 + agent de contrôle physique
A1 + Dutch/French-language contract + Limosa-L. Authorised health physicist (agent de contrôle physique / fysisch controleagent) per site under RGPRI/ARBIS.
03. §30bis + Constructiv + FANC onboarding
Sub-contractor §30bis withholding. Constructiv enrolment. FANC/AFCN + Bel V personnel clearance per site (non-portable across NPPs).
04. SIOD + TSW/CLS + FANC-defensible evidence pack
Minimum pack: SEPA-traceable remuneration, language-appropriate contract, Limosa-1 receipt, RSZ-ONSS DmfA, FANC/AFCN personnel-clearance record per individual.
05. India and Gulf sourcing corridors — limited applicability
Indian and Gulf nuclear-trade pools constrained by FANC/AFCN personnel-clearance. Civil-trade and electrical scope viable; controlled-area scope is EU-internal.