NORWAY · GREEN HYDROGEN ELECTROLYSER PLANT

Yara Herøya 24 MW PEM operational June 2024, Nel Herøya 1 GW/yr stack, TiZir Tyssedal NOK 261 m Enova.

Cross-border green-hydrogen workforce mobilisation against Yara Herøya 24 MW PEM electrolyser (inaugurated by PM Støre 10 June 2024; ~10,000 kg H₂/day; 20,500 t/yr ammonia capacity; cuts ~41,000 t CO₂/yr), Nel Hydrogen Herøya electrolyser-stack manufacturing (Line 1 April 2022 + Line 2 operational; 1 GW/yr alkaline-stack capacity), TiZir Titanium & Iron Tyssedal (Eramet/Mineral Deposits JV; NOK 261 m Enova grant; pilot H₂ start 2023; full-scale plant targeted 2029; 100,000 t/yr coal displacement) — NVE concession, DSB ATEX under Forskrift om håndtering av farlig stoff, NEK 400 + NEK EN IEC 60079.

Request Technical Briefing
24 MW PEM Yara Herøya operational June 2024
1 GW/yr Nel Hydrogen Herøya stack output
NOK 261 m TiZir Tyssedal Enova grant
Group IIC H₂ ATEX classification

Regulator exposure profile

  • DSB ATEX + Forskrift om farlig stoff28%
  • NVE concession + Energiloven24%
  • Allmenngjøringsloven Verkstedoverenskomsten26%
  • NEK 400 + NEK EN IEC 6007922%

Named projects in this jurisdiction

  • Yara Herøya 24 MW PEM electrolyser (ITM Power; inaugurated by PM Støre 10 June 2024; ~10,000 kg H₂/day; 20,500 t/yr ammonia capacity; cuts ~41,000 t CO₂/yr) Yara International 2024
  • Nel Hydrogen Herøya electrolyser-stack manufacturing (Line 1 April 2022; Line 2 operational; 1 GW/yr alkaline-stack capacity; expansion path to 2 GW) Nel ASA
  • TiZir Titanium & Iron Tyssedal (Eramet/Mineral Deposits JV; NOK 261 m Enova grant; pilot H₂ start 2023; full-scale plant targeted 2029; 100,000 t/yr coal displacement; IPCEI status) TiZir (Eramet + Mineral Deposits)
  • Equinor Mongstad blue-hydrogen export pipeline to Germany (CANCELLED September 2024; demand/capex justification absent) Equinor 2024

Norway’s H₂ anchor in 2026 is Yara Herøya (24 MW PEM operational June 2024) plus Nel Hydrogen Herøya electrolyser-stack manufacturing (1 GW/yr) and TiZir Tyssedal pilot (Eramet JV; NOK 261 m Enova grant). Equinor Mongstad blue-H₂ export was cancelled September 2024.

01. Pre-pricing — Allmenngjøringsloven Verkstedoverenskomsten

Engineering-industry workforce under Allmenngjøringsloven Verkstedoverenskomsten CBA. Norway-bank-traceable remuneration mandatory.

02. A1 + Norwegian-language contract + DSB ATEX H₂ competency

A1 + Norwegian-language contract predate site arrival. DSB ATEX Group IIC + Temperature Class T1 competence per H₂ zone worker.

03. NVE + Enova grant onboarding

NVE concession at grid-connection interface. Enova innovation-grant disbursement schedule per IPCEI-tagged project (TiZir Tyssedal).

04. A-krimsenter-defensible evidence pack

Minimum pack: Norway-bank-traceable remuneration, Norwegian-language contract, A1 receipt, Allmenngjøringsloven Verkstedoverenskomsten tariff reconciliation, DSB ATEX competency record per H₂-zone worker.

05. India and Gulf sourcing corridors — the Norway H₂ pathway

Indian and Gulf H₂-process trade pools through Larsen & Toubro Heavy Engineering + ADNOC. The 8 to 14-week corridor delivers Group-IIC-competent candidates against Yara Herøya, Nel, or TiZir Tyssedal.

Same application, other jurisdictions

Scope your Norway Green Hydrogen Plant deployment.