Yara Herøya 24 MW PEM operational June 2024, Nel Herøya 1 GW/yr stack, TiZir Tyssedal NOK 261 m Enova.
Cross-border green-hydrogen workforce mobilisation against Yara Herøya 24 MW PEM electrolyser (inaugurated by PM Støre 10 June 2024; ~10,000 kg H₂/day; 20,500 t/yr ammonia capacity; cuts ~41,000 t CO₂/yr), Nel Hydrogen Herøya electrolyser-stack manufacturing (Line 1 April 2022 + Line 2 operational; 1 GW/yr alkaline-stack capacity), TiZir Titanium & Iron Tyssedal (Eramet/Mineral Deposits JV; NOK 261 m Enova grant; pilot H₂ start 2023; full-scale plant targeted 2029; 100,000 t/yr coal displacement) — NVE concession, DSB ATEX under Forskrift om håndtering av farlig stoff, NEK 400 + NEK EN IEC 60079.
Request Technical BriefingRegulator exposure profile
- DSB ATEX + Forskrift om farlig stoff28%
- NVE concession + Energiloven24%
- Allmenngjøringsloven Verkstedoverenskomsten26%
- NEK 400 + NEK EN IEC 6007922%
Electrolyser stack defines the zoning.
Yara Herøya + Nel Hydrogen + TiZir Tyssedal electrolyser projects zone outward from the stack. DSB ATEX under Forskrift om håndtering av farlig stoff + NEK EN IEC 60079-series + NVE concession.
▲ Most restricted at centre
Electrolyser stack · H₂ source
-
Zone 0
Continuous H₂ at stack
- Group IIC
- T1 temp class
- DSB ATEX
-
Zone 1
Intermittent H₂ in process volumes
- IIC-rated PPE
- NEK EN IEC 60079-10-1
-
Zone 2
Abnormal-operation H₂ leakage
- ISO 19880-1:2020
- NEK EN IEC 60079-14
-
Non-classified
Outside ATEX-zoned envelope
Named projects in this jurisdiction
- Yara Herøya 24 MW PEM electrolyser (ITM Power; inaugurated by PM Støre 10 June 2024; ~10,000 kg H₂/day; 20,500 t/yr ammonia capacity; cuts ~41,000 t CO₂/yr) Yara International 2024
- Nel Hydrogen Herøya electrolyser-stack manufacturing (Line 1 April 2022; Line 2 operational; 1 GW/yr alkaline-stack capacity; expansion path to 2 GW) Nel ASA
- TiZir Titanium & Iron Tyssedal (Eramet/Mineral Deposits JV; NOK 261 m Enova grant; pilot H₂ start 2023; full-scale plant targeted 2029; 100,000 t/yr coal displacement; IPCEI status) TiZir (Eramet + Mineral Deposits)
- Equinor Mongstad blue-hydrogen export pipeline to Germany (CANCELLED September 2024; demand/capex justification absent) Equinor 2024
Norway’s H₂ anchor in 2026 is Yara Herøya (24 MW PEM operational June 2024) plus Nel Hydrogen Herøya electrolyser-stack manufacturing (1 GW/yr) and TiZir Tyssedal pilot (Eramet JV; NOK 261 m Enova grant). Equinor Mongstad blue-H₂ export was cancelled September 2024.
01. Pre-pricing — Allmenngjøringsloven Verkstedoverenskomsten
Engineering-industry workforce under Allmenngjøringsloven Verkstedoverenskomsten CBA. Norway-bank-traceable remuneration mandatory.
02. A1 + Norwegian-language contract + DSB ATEX H₂ competency
A1 + Norwegian-language contract predate site arrival. DSB ATEX Group IIC + Temperature Class T1 competence per H₂ zone worker.
03. NVE + Enova grant onboarding
NVE concession at grid-connection interface. Enova innovation-grant disbursement schedule per IPCEI-tagged project (TiZir Tyssedal).
04. A-krimsenter-defensible evidence pack
Minimum pack: Norway-bank-traceable remuneration, Norwegian-language contract, A1 receipt, Allmenngjøringsloven Verkstedoverenskomsten tariff reconciliation, DSB ATEX competency record per H₂-zone worker.
05. India and Gulf sourcing corridors — the Norway H₂ pathway
Indian and Gulf H₂-process trade pools through Larsen & Toubro Heavy Engineering + ADNOC. The 8 to 14-week corridor delivers Group-IIC-competent candidates against Yara Herøya, Nel, or TiZir Tyssedal.