SOGIN decommissioning Caorso + Garigliano + Trino + Latina to 2036, Enel-Leonardo-Ansaldo state NewCo announcement, EDF-Edison-ENEA SMR MoU, newcleo + Maire/Nextchem LFR JV.
Cross-border nuclear workforce mobilisation against post-1987-referendum Italy: SOGIN dismantles legacy reactors (Caorso BWR reactor-building dismantling launched late 2024 with ~3,400 t metal to remove; Garigliano BWR RPV first-phase completed early 2024 with RPV completion targeted 2027 + interim storage DT2 commissioning H1 2026; Trino Vercellese PWR decommissioning since 2012; Latina gas-cooled with Ministry decree authorising initial phase; SOGIN portfolio completion 2036), Enel-Leonardo-Ansaldo state NewCo (announcement-stage for nuclear feasibility studies; Italian National Integrated Plan for Energy and Climate envisions 11-22% nuclear share by 2050; 10-15-year deployment horizon per Enel statement), EDF-Edison-ENEA SMR MoU on industrial SMR applications (announcement-stage), and newcleo (UK-based partly Italian-origin) + Maire's Nextchem JV for Lead-cooled Fast Reactor SMR plant — ISIN Ispettorato Nazionale Sicurezza Nucleare + D.Lgs. 31/2010 transposing Euratom + D.Lgs. 101/2020 + D.Lgs. 45/2014.
Request Technical BriefingRegulator exposure profile
- ISIN + D.Lgs. 45/201428%
- D.Lgs. 31/2010 + D.Lgs. 101/202026%
- CCNL Edilizia + Cassa Edile24%
- D.Lgs. 81/2008 + Euratom BSS22%
ISIN + per-station WPQR anchor every nuclear lot.
SOGIN decommissioning portfolio + Enel-Leonardo-Ansaldo NewCo + EDF-Edison-ENEA SMR + newcleo LFR JV clearance pathways: ISIN under D.Lgs. 45/2014 + D.Lgs. 31/2010 radioactive-waste discipline + D.Lgs. 101/2020 radiation protection (Euratom BSS transposition).
- 01 T-18mo
Clearance start
ISIN security vetting + radiation-protection authorisation
- ISIN
- D.Lgs. 101/2020
- 02 T-12mo
Decommissioning licence
D.Lgs. 31/2010 framework + Ministry decree per site
- D.Lgs. 31/2010
- Min. Eco. Sviluppo decree
- 03 T-6mo
WPQR scope
Per-station decommissioning welder qualification
- EN ISO 9606-1
- ASME III equivalence
- 04 T+0
On-site work
SOGIN dismantling supervised by ISIN
- SOGIN
- ISIN
- 05 T+8wk
Demob
Handover + post-work assurance
- SOGIN protocol
Named projects in this jurisdiction
- SOGIN decommissioning portfolio: Caorso BWR (reactor-building dismantling launched late 2024; ~3,400 t metal to remove; decommissioning since 1999; completion 2031), Garigliano BWR (RPV first-phase dismantling completed early 2024; RPV completion targeted 2027; interim storage DT2 commissioning H1 2026), Trino Vercellese PWR (decommissioning since 2012; greenfield target 2024), Latina gas-cooled (Ministry decree authorising initial decommissioning phase issued); portfolio completion target 2036 SOGIN
- Enel-Leonardo-Ansaldo Nuclear Joint Initiative (state-controlled NewCo for nuclear feasibility studies; Enel CEO position: feasibility-only initially, no manufacturing commitment; 10-15-year deployment horizon) Enel + Ansaldo Nucleare + Leonardo NewCo
- EDF-Edison-ENEA SMR MoU (signed on industrial SMR applications) EDF + Edison + ENEA
- newcleo + Maire/Nextchem LFR JV (UK-based newcleo partly Italian-origin + Maire's Nextchem unit; JV agreement for Lead-cooled Fast Reactor SMR plant construction) newcleo + Maire-Nextchem
Italy’s nuclear sector remains post-1987-referendum decommissioning (SOGIN Caorso + Garigliano + Trino + Latina to 2036) plus 2024-2026 nuclear-return announcements: Enel-Leonardo-Ansaldo NewCo (feasibility-only), EDF-Edison-ENEA SMR MoU, newcleo + Maire/Nextchem LFR JV. No Italian SMR project at FID as of 2026. ISIN supervises under D.Lgs. 45/2014.
01. Pre-pricing — CCNL Edilizia + EN ISO 9606-1 WPQR
Decommissioning + pressure-part workforce under CCNL Edilizia + regional Cassa Edile + EN ISO 9606-1 WPQR scope per legacy reactor.
02. A1 + Italian-language contract + ISIN clearance
A1 + Italian-language contract predate site arrival. ISIN radiation-protection authorisation (12-18 month lead-time) per radiation-zone worker.
03. SOGIN / Min. Eco. Sviluppo onboarding
SOGIN operator-specific induction per Caorso / Garigliano / Trino / Latina site. Ministry decree compliance per decommissioning phase.
04. Ispettorato + ISIN-defensible evidence pack
Minimum pack: Italy-bank-traceable remuneration, Italian-language contract, A1 receipt, CCNL Edilizia tariff reconciliation, ISIN authorisation + WPQR scope-match per decommissioning welder.
05. India and Gulf sourcing corridors — the Italy nuclear pathway
Indian BHEL + Larsen & Toubro Special Steels + NPCIL pressure-part welder pools. The 12 to 18-week corridor (extended by ISIN clearance lead-time) delivers ASME III/RCC-M/EN 13445-eligible candidates against SOGIN decommissioning or future Enel-Ansaldo / newcleo SMR construction.