BELGIUM · GREEN HYDROGEN ELECTROLYSER PLANT

Hyoffwind Zeebrugge (25 MW), Port of Antwerp Hydrogen Coalition, John Cockerill Seraing manufacturing HQ.

Cross-border H₂ electrolyser workforce mobilisation against Hyoffwind Zeebrugge (25 MW electrolyser; Virya Energy / Parkwind / Fluxys consortium), Port of Antwerp-Bruges Hydrogen Import Coalition initiatives, and John Cockerill Seraing electrolyser-manufacturing HQ — Federal Hydrogen Strategy (October 2022), ATEX zoning under Codex Book III Title 4.

Request Technical Briefing
25 MW Hyoffwind electrolyser
Oct 2022 Federal Hydrogen Strategy
Group IIC H₂ ATEX classification
CREG Hydrogen network regulation

Regulator exposure profile

  • Codex Book III Title 4 + ATEX28%
  • Limosa-L + §30bis + SIOD24%
  • CREG hydrogen network framework22%
  • Constructiv + PC 124 + PC 111/20926%

Named projects in this jurisdiction

  • Hyoffwind Zeebrugge (25 MW electrolyser; Virya Energy + Parkwind + Fluxys consortium) Virya Energy / Parkwind / Fluxys
  • Port of Antwerp-Bruges Hydrogen Import Coalition initiatives Port of Antwerp-Bruges + consortium partners
  • John Cockerill Seraing — electrolyser-manufacturing HQ (not production plant) John Cockerill Hydrogen

Belgium’s hydrogen build-out spans Zeebrugge (Hyoffwind) and Antwerp (Hydrogen Import Coalition). John Cockerill Seraing is the electrolyser-manufacturing HQ — not a production plant. Federal Hydrogen Strategy was issued October 2022.

01. Pre-pricing — PC 111/209 + PC 124 split

Process workforce under PC 111 / 209 metal-trade CBAs. Civil shell under PC 124 BTP.

02. Limosa-L + A1 + ATEX competency

A1 + Dutch/French-language contract + Limosa-L predate site arrival. Codex Book III Title 4 ATEX competency per H₂ zone worker.

03. §30bis + Constructiv onboarding

Sub-contractor §30bis withholding. Constructiv enrolment for civil-trade portion.

04. SIOD + TSW/CLS + CREG-defensible evidence pack

Minimum pack: SEPA-traceable remuneration, language-appropriate contract, Limosa-1 receipt, RSZ-ONSS DmfA, ATEX competency record per worker.

05. India and Gulf sourcing corridors — the BE H₂ pathway

Indian and Gulf H₂-process trade pools. The 8 to 14-week corridor delivers Group-IIC-competent candidates against Hyoffwind Zeebrugge or Port of Antwerp initiatives.