SWEDEN · HVDC INTERCONNECTOR STATION

SydVästlänken operational 2021, NordBalt SE-LT 2016, Fenno-Skan 3 late-2030s — Hansa PowerBridge terminated June 2024.

Cross-border converter-station workforce mobilisation against SydVästlänken (Barkeryd-Hurva 2×600 MW HVDC VSC, commissioned 27 July 2021), NordBalt SE-LT (Nybro-Klaipėda 700 MW HVDC, operational since 2016), and Fenno-Skan 3 SE-FI HVDC (planning phase, target late-2030s). NOTE: Hansa PowerBridge SE-DE was TERMINATED June 2024 — Swedish government rejected concession 13 June 2024.

Request Technical Briefing
2×600 MW SydVästlänken Barkeryd-Hurva VSC
700 MW NordBalt SE-LT HVDC
TERMINATED Hansa PowerBridge June 2024
SVK Svenska kraftnät

Regulator exposure profile

  • SVK + Elsäkerhetsverket28%
  • Prop. 2025/26:87 + Lag 2018:147224%
  • IEC 62501 / IEC 6193624%
  • IF Metall + Byggnads24%

Named projects in this jurisdiction

  • SydVästlänken (Barkeryd-Hurva 2×600 MW HVDC VSC, commissioned 27 July 2021; Hallsberg-Barkeryd 400 kV AC since 2015) Svenska kraftnät 2021
  • NordBalt SE-LT (Nybro-Klaipėda 700 MW HVDC, operational since 2016) Svenska kraftnät + Litgrid
  • Fenno-Skan 3 SE-FI HVDC (planning phase, target late-2030s) Svenska kraftnät + Fingrid
  • Hansa PowerBridge SE-DE (TERMINATED June 2024, government rejected concession 13 June 2024) Svenska kraftnät (terminated)

Svenska kraftnät (SVK) operates the Swedish transmission grid + the SE-side HVDC interconnectors. SydVästlänken (2021) is the headline VSC project. Hansa PowerBridge SE-DE was terminated in June 2024.

01. Pre-pricing — IF Metall + Elsäkerhetsverket

Energised-work portion under IF Metall + Elsäkerhetsverket auktorisation A/AL/B (4-6 month pathway for utländska meriter).

02. Migrationsverket arbetstillstånd + A1 + SVK contractor framework

A1 + Swedish-language contract + arbetstillstånd at SEK 33,390 floor + SVK contractor-framework registration (non-portable across other-TSO assets).

03. IF Metall + Byggnads onboarding

Process portion at IF Metall. Civil portion at Byggnads.

04. Arbetsmiljöverket + Skatteverket-defensible evidence pack

Minimum pack: SEK / EUR remuneration to Swedish bank, language-appropriate contract, arbetstillstånd, ID06, F-skatt-godkänd, Elsäkerhetsverket auktorisation A record per HV worker.

05. India and Gulf sourcing corridors — the SE HVDC pathway

Indian IIW-certified HV fitters + BHEL substation commissioners. The 4-6 month Elsäkerhetsverket utländska-meriter recognition pathway. The 8 to 14-week corridor delivers candidates against SydVästlänken or NordBalt.