Skip to main content
NETHERLANDS · HVDC INTERCONNECTOR STATION

NorNed (NL-NO), BritNed (NL-UK), COBRAcable (NL-DK) — TenneT NL-side anchor.

Cross-border converter-station workforce mobilisation against TenneT NL-administered HVDC links — NorNed (700 MW), BritNed (1,000 MW), COBRAcable (700 MW ±320 kV) — IEC 61936, NEN-EN 50110, NEN 3140 / NEN 3840.

Request Technical Briefing
700-1000 MW Interconnector capacity range
±320 kV COBRAcable VSC HVDC voltage
25.73% BPF Bouw 2026 pension premium
TenneT NL TSO contractor framework

Regulator exposure profile

  • TenneT HSE Passport + ACM30%
  • IEC 62501 / IEC 6193624%
  • WagwEU + Wtta (2027)24%
  • NEN 3840 / NEN 314022%

Named projects in this jurisdiction

  • NorNed NL-NO (580 km, 700 MW, since 2008) TenneT + Statnett
  • BritNed NL-UK (260 km, 1,000 MW, Maasvlakte ↔ Isle of Grain, since 2011) BritNed Development Ltd (National Grid + TenneT JV)
  • COBRAcable NL-DK (Eemshaven ↔ Endrup, ±320 kV, 700 MW, since Sept 2019) TenneT + Energinet.dk

TenneT NL-side operates three HVDC interconnectors. NorNed (NL-NO) was the world’s longest HVDC subsea at commissioning in 2008; BritNed (NL-UK) came in 2011; COBRAcable (NL-DK) at ±320 kV VSC commissioned September 2019.

01. Pre-pricing — CAO Metalektro + CAO Bouw split

Converter-station workforce is principally electrical, so CAO Metalektro carries the wage floor on the energised work; the TenneT HSE Passport is the operational authorisation gate. Civil-shell scope on the converter-hall sits under CAO Bouw & Infra 2025-2027 with BPF Bouw 25.73% pension premium.

02. MeldNL + A1 + TenneT HSE Passport

A1 + MeldNL filing + TenneT HSE Passport registration predate site arrival. The HSE Passport is non-portable across TenneT vs other-TSO assets — a worker authorised on COBRAcable substations needs separate registration for BritNed substations.

03. BPF Bouw + CAO Metalektro onboarding

Civil-trade portion at BPF Bouw 25.73%. Energised-work portion enrols against CAO Metalektro.

04. NLA-defensible evidence pack

Standard WagwEU + Wtta-phasing profile plus TenneT-specific competency-register reconciliation. Minimum survivable pack: SEPA-traceable remuneration, CAO-compliant timesheets, MeldNL submission, NEN 3840 / NEN 3140 aanwijzing, TenneT HSE Passport record.

05. India and Gulf sourcing corridors — the EFK-equivalent pathway

Indian electrical-trade pool delivers IIW-certified high-voltage fitters + BHEL-trained substation commissioners. Anerkenning van Beroepskwalificaties recognition + TenneT HSE Passport scheduled into post-arrival 2-4 week window.

The 8 to 14-week corridor delivers the NEN-3840-eligible candidate against NorNed, BritNed or COBRAcable.

Same application, other jurisdictions

Scope your Netherlands HVDC Interconnector deployment.

Request a Technical Briefing