Skip to main content
NORWAY · HYPERSCALE DATA CENTRE

Green Mountain DC1-3, Bulk N01 1 GW CoreWeave NVIDIA, Lefdal Mine 80 MW, Microsoft Norway East, Google Skien €600 m.

Cross-border hyperscale data-centre workforce mobilisation against Green Mountain DC1-Stavanger / DC2-Rjukan / DC3-Oslo (operator-owned trio), Bulk Infrastructure N01 Vennesla (400 MW secured, 1 GW potential; CoreWeave NVIDIA GB200 NVL72 cluster targeted summer 2025), Lefdal Mine Datacenter (80 MW available, 200 MW planned ceiling), Microsoft Norway East (Oslo region operational with Availability Zones), and Google Skien Gromstul (€600 m Phase 1, 240 MW allocation, go-live 2026) — NVE concession, Skatteetaten elavgift, NEK 400, Allmenngjøringsloven sectoral CBAs + Innleielov §14 (Oslofjord temp-agency restrictions April 2023).

Request Technical Briefing
400 MW → 1 GW Bulk N01 Vennesla
€600 m Google Skien Phase 1
NVE Power concession authority
§14 Innleielov Oslofjord agency-hire restriction (Apr 2023)

Regulator exposure profile

  • NVE concession + Energiloven28%
  • Allmenngjøringsloven + §14 Innleielov26%
  • NEK 400 + DSB EX/ATEX24%
  • Skatteetaten elavgift22%

Named projects in this jurisdiction

  • Green Mountain DC1-Stavanger (former NATO bunker ~26 MW) + DC2-Rjukan (~35 MW initial) + DC3-Oslo Enebakk (75,000 m², up to 75 MW) Green Mountain AS
  • Bulk Infrastructure N01 Vennesla (400 MW secured, 1 GW potential; CoreWeave NVIDIA GB200 NVL72 cluster targeted summer 2025; 42 MW expansion broke ground January 2024) Bulk Infrastructure 2024
  • Lefdal Mine Datacenter (Måløy, Nordfjord; 80 MW available post-2024 60 MW expansion; 200 MW ceiling; 120,000 m² across 75 underground halls) Lefdal Mine AS
  • Microsoft Norway East (Oslo region; operational with Availability Zones; original 2018 two-region announcement) Microsoft 2018
  • Google Skien Gromstul (€600 m Phase 1; 240 MW allocation; ~200 ha land acquired 2019; first-phase completion Q4 2025, go-live 2026) Google

Norway’s hyperscale cluster centres on Green Mountain (DC1-Stavanger / DC2-Rjukan / DC3-Oslo), Bulk Infrastructure N01 Vennesla (400 MW secured, 1 GW potential — CoreWeave NVIDIA GB200 NVL72 cluster targeted summer 2025), Lefdal Mine (80 MW underground), Microsoft Norway East (Oslo region operational since 2018), and Google Skien Gromstul (€600 m Phase 1 go-live 2026). NVE holds grid-concession authority; Allmenngjøringsloven + Innleielov §14 govern the workforce envelope.

01. Pre-pricing — Allmenngjøringsloven + Verkstedoverenskomsten

Workforce under Allmenngjøringsloven sectoral CBA. Industrial-trade hyperscale-DC fit-out sits under Verkstedoverenskomsten. Norway-bank-traceable remuneration mandatory.

02. A1 + Norwegian-language contract + §14 Innleielov

A1 + Norwegian-language contract predate site arrival. Arbeidsmiljøloven §14-12 Innleielov restricts temp-agency hire on Oslofjord construction sites (tightened April 2023) — agency-hire path largely closed for new deployments.

03. NVE concession + Skatteetaten elavgift onboarding

NVE concession at grid-connection interface. Skatteetaten elavgift (electrical power tax) at operational year-1. Operator-specific Cx programme per Green Mountain / Bulk / Lefdal / Microsoft / Google standard.

04. A-krimsenter-defensible evidence pack

Minimum pack: Norway-bank-traceable remuneration, Norwegian-language contract, A1 receipt, Allmenngjøringsloven Verkstedoverenskomsten tariff reconciliation per worker, NEK 400 + DSB EX/ATEX competency record per electrical worker.

05. India and Gulf sourcing corridors — the Norway hyperscale-DC pathway

Indian cleanroom-fitters via Larsen & Toubro Construction + Gulf hyperscale-DC trades via Saudi Binladin / Arabtec. The 8 to 14-week corridor delivers Allmenngjøringsloven-eligible candidates against Bulk N01, Lefdal Mine, or Google Skien.

Same application, other jurisdictions

Scope your Norway Hyperscale Data Centre deployment.

Request a Technical Briefing