ITALY · BATTERY GIGAFACTORY BUILD

ACC Termoli shelved Feb 2026, Italvolt Scarmagno stalled, Stellantis Mirafiori €40 m R&D operational, FAAM Teverola pilot.

Cross-border workforce mobilisation against a contracting Italian battery-cell market: ACC Termoli (Stellantis-TotalEnergies-Mercedes JV) was definitively shelved February 2026 after standby since May 2024 with €200 m EU funds reallocated; Italvolt Scarmagno (former Olivetti site, 45 GWh announced) is stalled/lapsed with no construction confirmed by Q1-Q2 2026; Stellantis Mirafiori Battery Technology Centre Turin (€40 m, operational) handles design/development/testing of battery packs + modules + software; and FAAM/Lithops Seri Industrial Teverola Caserta operates Italy's first lithium-ion cell pilot. Marketing copy should reflect sector contraction. D.Lgs. 81/2008 + MASE/MISE permits + ARPA regional permits.

Request Technical Briefing
Feb 2026 ACC Termoli shelved
€40 m Stellantis Mirafiori R&D
€200 m EU ACC reallocated funds 2024
D.Lgs. 81/2008 Italian work-safety code

Regulator exposure profile

  • MASE + MISE + ARPA permits28%
  • CCNL Edilizia + Cassa Edile26%
  • D.Lgs. 81/2008 Titolo XI ATEX24%
  • EU Battery Regulation 2023/154222%

Named projects in this jurisdiction

  • ACC Termoli (Stellantis-TotalEnergies-Mercedes-Benz JV; definitively shelved February 2026 per management communication to unions; standby since May 2024; Italian government reallocated €200 m EU funds in 2024) ACC (Stellantis + TotalEnergies + Mercedes-Benz JV) 2026
  • Italvolt Scarmagno (Piedmont, former Olivetti site; announced 45 GWh, 300,000 m²; land deal lapsed, no construction confirmed Q1-Q2 2026) Italvolt
  • Stellantis Mirafiori Battery Technology Centre Turin (€40 m investment; design + development + testing of battery packs, modules, software) Stellantis
  • FAAM/Lithops/Seri Industrial Teverola Caserta Campania (Italy's first lithium-ion cell pilot) Seri Industrial (FAAM-Lithops)

Italian battery-gigafactory pipeline is contracting in 2026: ACC Termoli definitively shelved Feb 2026, Italvolt Scarmagno stalled. Operational anchors are Stellantis Mirafiori R&D (€40 m, design + testing only) + FAAM Teverola cell pilot. Marketing copy should reflect sector contraction.

01. Pre-pricing — CCNL Edilizia + Cassa Edile

Construction-side under CCNL Edilizia + regional Cassa Edile. Italy-bank-traceable remuneration mandatory.

02. A1 + Italian-language contract + ATEX competency

A1 + Italian-language contract predate site arrival. D.Lgs. 81/2008 Titolo XI Atmosfere Esplosive Group IIIC dust + IIC vapour competence per dry-room worker.

03. MASE/MISE + ARPA onboarding

MASE/MISE permitting per facility. ARPA regional discharge reconciliation per Termoli/Scarmagno/Teverola.

04. INPS + INAIL + Ispettorato-defensible evidence pack

Minimum pack: Italy-bank-traceable remuneration, Italian-language contract, A1 receipt, CCNL Edilizia tariff reconciliation, D.Lgs. 81/2008 Titolo XI ATEX competency record per dry-room worker.

05. India and Gulf sourcing corridors — the Italy battery pathway

Limited Italy-sited demand given 2026 sector contraction; corridor activation contingent on Italvolt revival, Mirafiori scale-up, or new entrant. Indian dry-room pools through Larsen & Toubro + Tata Power held in reserve.