AESC Sunderland Plant 2 (Dec 2025 production start), Agratas Bridgwater (£4 bn, opening 2027) — DSEAR + HSE COMAH.
Cross-border gigafactory workforce mobilisation against AESC Sunderland Plant 2 (12 GWh, Nissan-anchored, production started Dec 2025; Wates principal contractor; £200 m UK Infrastructure Bank loan; £680 m NWF + UKEF guarantees) and Agratas Bridgwater Gravity Smart Campus (Tata/JLR, Somerset; 40 GWh; £4 bn; £380 m UK government grant; opening pushed to 2027) — Britishvolt FAILED (administration Jan 2023).
Request Technical BriefingRegulator exposure profile
- DSEAR 2002 + HSE COMAH28%
- Sponsor Licence + Skilled Worker24%
- CITB Levy + CIS + CSCS24%
- UN ECE R100 + IEC 62619 + IATF 1694924%
Dry-room layered by DSEAR zone.
AESC Sunderland Plant 2 + Agratas Bridgwater electrode-coating lines sit under DSEAR 2002 (UK ATEX transposition) + HSE COMAH upper-tier for solvent inventories. UN ECE R100 battery safety + IEC 62619.
▲ Process zones · most to least restricted
-
Electrode coating Zone 20
Continuous dust hazard · DSEAR
- DSEAR 2002
- IEC 62619
-
Calendaring Zone 21
Intermittent dust
- IIIC dust-rated PPE
-
Dry-room Zone 22
Abnormal-operation dust · dew-point < -40°C
- UL 9540A (cell propagation)
-
Cell-assembly Non-classified
Standard cleanroom
Named projects in this jurisdiction
- AESC Sunderland Plant 2 (12 GWh, Nissan-anchored, production started Dec 2025; Wates contractor; £200 m UKIB loan + £680 m NWF/UKEF guarantees) AESC + Nissan 2025
- Agratas Bridgwater Gravity Smart Campus (Tata/JLR; 40 GWh planned; £4 bn investment; £380 m UK government grant; 16,800+ piles installed; opening pushed to 2027) Agratas (Tata/JLR) 2027
- Britishvolt Northumberland (FAILED — administration Jan 2023; liquidation Nov 2024; site sold to Blackstone for data centre) Britishvolt (failed)
- AESC Sunderland Plant 3 (planning submitted) AESC
UK gigafactory market is now anchored by AESC Sunderland Plant 2 (operational since December 2025) and Agratas Bridgwater (under construction, opening 2027). Britishvolt failed (Jan 2023 administration → Nov 2024 liquidation; site sold to Blackstone for data centre).
01. Pre-pricing — CSCS + CIS + UN ECE R100
CSCS card per worker. CIS withholding 20%/30%. UN ECE R100 battery-safety competency for cell-handling crews.
02. Sponsor Licence + Skilled Worker + DSEAR competency
Sponsor Licence registration. Skilled Worker visa at £41,700. DSEAR 2002 competency per Zone-20/21/22 worker.
03. CITB + HSE COMAH onboarding
CITB Levy enrolment. HSE COMAH upper-tier for solvent-inventory scope cascades into contractor file requirements.
04. HMRC + HSE + Home Office-defensible evidence pack
Minimum pack: bank-traceable remuneration to UK bank, English-language CoS + contract, CIS deduction statements, CITB Levy returns, CSCS card, DSEAR competency record per zone worker.
05. India and Gulf sourcing corridors — the UK battery pathway
Indian L&T-trained pressure-part welders + BHEL controls engineers + ATEX-rated cleanroom fitters. The 8 to 14-week corridor delivers DSEAR-competent candidates against AESC Sunderland or Agratas Bridgwater.