Skip to main content
FINLAND · LNG TERMINAL CONSTRUCTION

Inkoo FSRU Exemplar 150,900 m³ €460 m Gasgrid, Hamina LNG Haminan Energia/Wärtsilä/Alexela JV, Pori LNG Gasum.

Cross-border LNG-terminal workforce mobilisation against Inkoo FSRU Exemplar Floating LNG Terminal Finland (Gasgrid Finland via subsidiary Floating LNG Terminal Finland Oy; 10-year bareboat charter from Excelerate Energy signed May 2023; operational since 28 December 2022 — emergency response to Russian gas cutoff; 150,900 m³ storage; >5 bcm/yr regasification; €460 m 10-year project cost), Hamina LNG Terminal (Hamina LNG Oy JV of Haminan Energia + Wärtsilä + Alexela — NOT Gasum; commercial commissioning October 2022; 30,000 m³ LNG storage / 15,000 t; 4,800 MWh/day regas), and Pori (Tahkoluoto) LNG Terminal (Gasum Oy; operational September 2016 — Finland's first LNG terminal; 28,500 m³ storage; €81 m cost; Skangass → Gasum brand consolidation October 2018) — Tukes pressure equipment + Act 390/2005 + Natural Gas Decree 551/2009.

Request Technical Briefing
150,900 m³ Inkoo FSRU storage
€460 m Inkoo FSRU 10-year project cost
Dec 2022 Inkoo emergency commissioning
Act 390/2005 Dangerous chemicals frame act

Regulator exposure profile

  • Tukes pressure equipment + Act 390/200528%
  • Energiavirasto + TSO regime24%
  • Rakennusliitto Infra CBA + Työturvallisuuslaki26%
  • tilaajavastuulaki 1233/200622%

Named projects in this jurisdiction

  • Inkoo FSRU Exemplar Floating LNG Terminal Finland (Gasgrid Finland via Floating LNG Terminal Finland Oy; 10-year bareboat charter from Excelerate Energy May 2023; operational since 28 December 2022; 150,900 m³ storage; >5 bcm/yr regas; €460 m 10-year cost; in routine maintenance dry-dock Aug-Oct 2025; FSRU remains moored at Inkoo per 2026 spot-capacity invitation) Gasgrid Finland + Excelerate Energy 2022
  • Hamina LNG Terminal (Hamina LNG Oy JV: Haminan Energia + Wärtsilä + Alexela — NOT Gasum; commercial commissioning October 2022; 30,000 m³ LNG storage / 15,000 t; 4,800 MWh/day regas) Hamina LNG Oy (Haminan Energia + Wärtsilä + Alexela) 2022
  • Pori (Tahkoluoto) LNG Terminal (Gasum Oy; operational September 2016 — Finland's first LNG terminal; 28,500 m³ storage; €81 m construction cost; Skangass → Gasum brand consolidation October 2018) Gasum Oy 2016

Finland’s LNG fleet runs through Inkoo FSRU Exemplar (Gasgrid 150,900 m³ €460 m; emergency response to Russian gas cutoff Dec 2022), Hamina LNG (Haminan Energia + Wärtsilä + Alexela JV — NOT Gasum; commissioned Oct 2022), and Pori Tahkoluoto (Gasum; operational since Sep 2016 as Finland’s first terminal). Tukes authorises pressure equipment under Act 390/2005.

01. Pre-pricing — Rakennusliitto Infra CBA + EN ISO 9606-1 WPQR

Construction + welder workforce under Rakennusliitto Infra CBA + EN ISO 9606-1 Charpy-qualified scope per Tukes-authorised welder.

02. A1 + Finnish-language contract + Tukes documentation

A1 + Finnish-language contract predate site arrival. Tukes authorisation per pressure-equipment-zone worker; Charpy 27 J/−196°C WPQR for −163°C LNG-zone work.

03. tilaajavastuulaki + Luotettava Kumppani onboarding

Vastuu Group Luotettava Kumppani register check per subcontractor before site access. Energiavirasto operability per Gasgrid TSO operation.

04. AVI + Tukes-defensible evidence pack

Minimum pack: Finland-bank-traceable remuneration, Finnish-language contract, A1 receipt, Rakennusliitto Infra CBA tariff reconciliation, Tukes authorisation + WPQR scope-match per pressure-part worker.

05. India and Gulf sourcing corridors — the Finland LNG pathway

Indian + Gulf cryogenic-welder pools through BHEL Heavy Plates + Larsen & Toubro Hydrocarbon Engineering. The 8 to 14-week corridor delivers Charpy-27J-at-−196°C-eligible candidates against Inkoo FSRU expansion, Hamina LNG, or Pori Tahkoluoto.

Same application, other jurisdictions

Scope your Finland LNG Terminal Construction deployment.

Request a Technical Briefing