Skip to main content
SWEDEN · RAIL / BAHNBAU DELIVERY (TRAFIKVERKET)

Infranord Jönköpingsbanan SEK 545 m 6-yr from 1 Apr 2025, Strukton Rail Stockholm SL Sep 2024-Sep 2031, Implenia Varbergstunneln traffic 14 Jul 2025, CENELEC EN 50126/50128/50129 + AFS 2003:6.

Swedish rail / Bahnbau delivery workforce against Infranord AB (state-owned; Jönköpingsbanan SEK 545 m / ~EUR 48 m 6-year framework from 1 April 2025; Trafikverket maintenance scope), Strukton Rail AB (Stockholm SL multi-year framework September 2024 to September 2031), NRC Group Sverige AB (Falun-Borlänge SEK 81 m / ~EUR 7 m maintenance), Implenia Sverige AB (Varbergstunneln SEK 3.5 bn / ~EUR 310 m double-track railway tunnel — traffic commenced 14 July 2025; first 16,400 m³ rock-tunnel excavation handed to Trafikverket Aug 2025), and Veidekke Sverige AB (rail-infrastructure delivery) — CENELEC EN 50126/50128/50129 + AFS 2003:6 (working environment — rail) + EBR (elsäkerhetsbestämmelser) + Trafikverket Network Statement 2025.

Request Technical Briefing
SEK 545 m 6-yr Infranord Jönköpingsbanan Apr 2025
Sep 2024-Sep 2031 Strukton Rail Stockholm SL
SEK 3.5 bn 14 Jul 2025 Implenia Varbergstunneln traffic
CENELEC EN 50126/8/9 Sweden rail-systems standard

Regulator exposure profile

  • CENELEC EN 50126/50128/5012928%
  • AFS 2003:6 + EBR24%
  • Byggavtalet + Lag 2018:147226%
  • Trafikverket Network Statement22%

Named projects in this jurisdiction

  • Infranord Jönköpingsbanan (Infranord AB state-owned; SEK 545 m / ~EUR 48 m 6-year framework from 1 April 2025; Trafikverket maintenance scope on Jönköping line) Infranord AB 2025
  • Strukton Rail Stockholm SL (Strukton Rail AB; Stockholm SL multi-year framework September 2024 to September 2031; metro + commuter-rail maintenance scope) Strukton Rail AB 2024
  • NRC Group Sverige Falun-Borlänge (NRC Group Sverige AB; SEK 81 m / ~EUR 7 m maintenance contract — Falun-Borlänge corridor; Trafikverket scope) NRC Group Sverige AB
  • Implenia Varbergstunneln (Implenia Sverige AB; SEK 3.5 bn / ~EUR 310 m double-track railway tunnel; traffic commenced 14 July 2025; first 16,400 m³ rock-tunnel excavation handed to Trafikverket August 2025) + Veidekke Sverige Rail (Veidekke Sverige AB; rail-infrastructure delivery) Implenia Sverige + Veidekke Sverige 2025

Swedish rail delivery: Infranord (state-owned; Jönköpingsbanan SEK 545 m 6-yr 1 Apr 2025), Strukton Rail (Stockholm SL Sep 2024-Sep 2031), NRC Group Sverige (Falun-Borlänge SEK 81 m), Implenia (Varbergstunneln SEK 3.5 bn — traffic 14 Jul 2025), Veidekke Sverige. CENELEC EN 50126/50128/50129 + AFS 2003:6 + EBR + Trafikverket Network Statement 2025 govern.

01. Pre-pricing — Byggavtalet + EBR-utbildning

Rail workforce under Byggavtalet (civil) + IF Metall (mechanical/electrical) + EBR-utbildning per electrified-line worker.

02. A1 + Swedish-language contract + CENELEC familiarisation

A1 + Swedish-language contract predate Swedish deployment. CENELEC EN 50126/50128/50129 + AFS 2003:6 familiarisation per safety-critical worker.

03. Trafikverket + Skatteverket onboarding

Trafikverket Network Statement 2025 possession-scheduling per project. Skatteverket employer registration. Migrationsverket arbetstillstånd per non-EU worker.

04. Skatteverket + Arbetsmiljöverket-defensible evidence pack

Minimum pack: Sweden-bank-traceable remuneration, Swedish-language contract, A1 receipt, Byggavtalet tariff reconciliation, AFS 2003:6 + EBR competency attestation per rail worker.

05. India and Gulf sourcing corridors — the Sweden rail pathway

Indian Larsen & Toubro Rail + Gulf Saudi Binladin pools route through Byggavtalet + EBR + CENELEC audit-grade chain-of-custody against Infranord, Strukton Rail, NRC Group Sverige, Implenia, or Veidekke Sverige rail scopes.

Same application, other jurisdictions

Scope your Sweden Rail / Bahnbau Delivery engagement.

Request a Technical Briefing