Skip to main content
FRANCE · RAIL / BAHNBAU DELIVERY

SNCF Réseau €1.8 bn 2024-2031 RVB programme (Eiffage+Captrain / ETF+Colas Rail / TSO), TSO ballast HSL €187 m / 209 km, ETF LGV Est phase 2.

French rail / Bahnbau delivery workforce against ETF — Eurovia Travaux Ferroviaires (Vinci Construction sub), Colas Rail (Colas SA Bouygues group), TSO Ferroviaire (NGE group), NGE Rail, and Spie batignolles Rail — anchored by SNCF Réseau 2024-2031 RVB (rail-track-ballast) renewal programme €1.8 bn (three groupings: Eiffage+Captrain / ETF+Colas Rail lead / TSO) — TSO grouping covers ballast on high-speed lines: firm 3-year tranche 209 km + 3× 1-year renewable tranches ~230 km each = up to €187 m (60% Colas / 40% TSO) + ETF "dense network zones" RVB + LGV Est phase 2 Metz-Strasbourg (ETF Vinci prime). EPSF (Établissement public de sécurité ferroviaire) authorisations per Code des transports + Décret 2006-369 + CENELEC EN 50126/50128/50129 RAMS + NF EN 50122-1.

Request Technical Briefing
€1.8 bn 7-yr SNCF Réseau renewal envelope
€187 m / 209 km firm TSO ballast HSL tranche
EPSF authorisation FR rail safety authority
CENELEC EN 50126/8/9 RAMS triad

Regulator exposure profile

  • EPSF + Code des transports L. 220028%
  • CENELEC EN 50126/50128/5012926%
  • IDCC 1702 + IDCC 004424%
  • SIPSI + URSSAF + Loi 2017-39922%

Named projects in this jurisdiction

  • SNCF Réseau 2024-2031 RVB (rail-track-ballast) renewal programme €1.8 bn awarded to three groupings: Eiffage+Captrain + ETF+Colas Rail lead + TSO; TSO grouping covers ballast on high-speed lines: firm 3-year tranche 209 km + 3× 1-year renewable tranches ~230 km each = up to €187 m (60% Colas / 40% TSO) SNCF Réseau + Eiffage / ETF / Colas Rail / TSO 2024
  • ETF Eurovia Travaux Ferroviaires (Vinci Construction sub; "dense network zones" RVB awarded by SNCF Réseau; LGV Est phase 2 Metz-Strasbourg prime works package) ETF (Vinci Construction)
  • Colas Rail (Colas SA Bouygues group; ETF+Colas Rail lead grouping under €1.8 bn SNCF Réseau RVB) Colas Rail (Colas SA Bouygues group)
  • TSO Ferroviaire (NGE group; HSL ballast tranche) + NGE Rail + Spie batignolles Rail TSO Ferroviaire (NGE) + Spie batignolles Rail

French rail / Bahnbau delivery: ETF (Vinci), Colas Rail (Bouygues), TSO Ferroviaire (NGE), NGE Rail, Spie batignolles Rail. SNCF Réseau €1.8 bn 2024-2031 RVB. TSO HSL €187 m (209 km firm + 690 km options). EPSF + Code des transports + CENELEC govern.

01. Pre-pricing — IDCC 1702 + IDCC 0044 + ASP

Rail workforce under IDCC 1702 FNTP (civil shell) + IDCC 0044 metallurgie (signalling/OLE) + ASP (Agent Sécurité du Personnel) qualification.

02. A1 + French-language contract + EPSF dossier

A1 + French-language contract predate site arrival. EPSF safety dossier + CENELEC EN 50126/50128/50129 RAMS evidence per ERTMS-zone worker.

03. SNCF Réseau + EPSF onboarding

SNCF Réseau operator-specific induction per RVB lot. EPSF safety authorisation per gang.

04. URSSAF + DREETS-defensible evidence pack

Minimum pack: France-bank-traceable remuneration, French-language contract, A1 receipt, IDCC 1702 / 0044 tariff reconciliation, ASP qualification record per rail worker.

05. India and Gulf sourcing corridors — the France rail pathway

Indian rail-electrification pools through Larsen & Toubro Railway Strategic Business Group + RailTel. The 8 to 14-week corridor delivers ASP + EPSF-eligible candidates against ETF LGV Est phase 2, TSO HSL ballast, or Colas Rail RVB scopes.

Same application, other jurisdictions

Scope your France Rail / Bahnbau Delivery engagement.

Request a Technical Briefing