Iberdrola IBE + Acciona Energía ANE + Saitec DemoSATH BiMEP Sep 2023 + Navantia Fene/Avilés Saint-Brieuc 62 jackets + Sener, MITERD roadmap 1-3 GW floating 2030 + RD 150/2023 POEM.
Spanish offshore-wind delivery workforce against Iberdrola S.A. IBE (owner/developer; Iberdrola Renovables floating-wind project pipeline Canary Islands + Galicia), Acciona Energía S.A. ANE (developer; consortium partner in Spanish floating-wind tender preparation), Saitec Offshore Technologies (private Spanish engineering firm; developer of SATH Swinging Around Twin Hull floating platform technology; operates DemoSATH prototype installed off Vizcaya Basque coast at BiMEP test site fully grid-connected September 2023 — Saitec / EVE Ente Vasco de la Energía press release), Sener Ingeniería y Sistemas (private; floating-wind substructure engineering), and Navantia S.A. S.M.E. (state-owned shipbuilder 100% SEPI; Fene shipyard Galicia + Puerto Real Cádiz deliver floating-wind foundations + jackets for export — Saint-Brieuc France + East Anglia UK) — DemoSATH (Saitec / RWE / Kansai Electric; 2 MW prototype connected to BiMEP test grid September 2023 — Saitec corporate press release + EVE Basque Energy Agency confirmation) + Saint-Brieuc OWF France substructures (Navantia-Windar consortium fabricated 62 jacket foundations at Fene + Avilés between 2021-2023 for Iberdrola-led project) + Roadmap Eólica Marina y Energías del Mar (MITERD published Spanish offshore-wind roadmap December 2021 targeting 1-3 GW floating by 2030) + Maritime Spatial Planning Plans POEMs (approved 28 February 2023 by RD 150/2023 defining offshore-wind suitable zones ZAPER). RD 150/2023 Maritime Spatial Plans + Ley 24/2013 del Sector Eléctrico for grid connection + RD 1028/2007 original offshore-wind authorisation framework + pending 2025 RD (in legislative pipeline) introducing competitive maritime concession + grid-access tender + Ley 41/2010 Protección del Medio Marino + Ley 45/1999 plus IMO STCW for marine crew + Convenio General de Trabajo en el Mar for Spanish-flagged vessels.
Request Technical BriefingRegulator exposure profile
- RD 150/2023 POEM + Ley 41/201026%
- Ley 24/2013 Sector Eléctrico24%
- Convenio Trabajo en el Mar + STCW28%
- Estatuto ET Art. 42 + REA + TPC22%
Atlantic + Mediterranean vessel-window seasonality.
Spanish offshore-wind deployment windows: DemoSATH BiMEP Basque coast operational since September 2023 + Saint-Brieuc 62 Navantia jackets (2021-2023) + MITERD roadmap targets 1-3 GW floating by 2030. Iberdrola + Acciona Energía + Saitec + Sener + Navantia delivery prime universe.
Named projects in this jurisdiction
- DemoSATH (Saitec / RWE / Kansai Electric; 2 MW prototype connected to BiMEP test grid September 2023 — Saitec corporate press release; EVE Basque Energy Agency confirmation) Saitec / RWE / Kansai Electric / EVE 2023
- Saint-Brieuc OWF France substructures (Navantia-Windar consortium fabricated 62 jacket foundations at Fene + Avilés between 2021-2023 for Iberdrola-led project; Spanish-built fabrication for French OWF export) Navantia-Windar consortium / Iberdrola 2023
- Roadmap Eólica Marina y Energías del Mar (MITERD published Spanish offshore-wind roadmap December 2021 targeting 1-3 GW floating by 2030) + Maritime Spatial Planning Plans POEMs (approved 28 February 2023 by RD 150/2023 defining offshore-wind suitable zones ZAPER) MITERD + Council of Ministers 2023
- Iberdrola S.A. (IBE; Iberdrola Renovables floating-wind pipeline Canary Islands + Galicia) + Acciona Energía S.A. (ANE) + Saitec Offshore Technologies (private; SATH technology) + Sener Ingeniería y Sistemas (private) + Navantia S.A. S.M.E. (100% SEPI state-owned; Fene + Puerto Real shipyards) IBE + ANE + Saitec + Sener + Navantia
Spanish offshore-wind: Iberdrola (IBE; Renovables pipeline Canary + Galicia), Acciona Energía (ANE), Saitec (SATH DemoSATH BiMEP Sep 2023 2 MW), Sener (private substructure), Navantia (100% SEPI; Fene + Puerto Real; Saint-Brieuc 62 jackets 2021-2023). MITERD roadmap 1-3 GW floating 2030 + RD 150/2023 POEM 28 Feb 2023. Convenio Trabajo en el Mar + STCW + Ley 24/2013 govern.
01. Pre-pricing — Convenio Trabajo Mar + CGSC + STCW
Marine-crew scope under Convenio General de Trabajo en el Mar. Onshore civil under VI CGSC + TPC. STCW for vessel crew per IMO.
02. A1 + TGSS + STCW pre-deployment
TGSS-issued A1 portable document. Ley 45/1999 + RD-Ley 7/2021 posted-worker notification. IMO STCW for marine crew.
03. ITSS + MITERD + Capitanía Marítima onboarding
ITSS enforcement. MITERD POEM compliance per project. Capitanía Marítima maritime permitting.
04. ITSS + TGSS-defensible evidence pack
Minimum pack: Spain-bank-traceable remuneration, Spanish-language contract, A1 receipt, REA registration, CGSC reconciliation, TPC card per worker, STCW per marine-crew worker, EN 1090 EXC3+ per fabrication-yard worker.
05. India and Gulf sourcing corridors — the Spain offshore-wind pathway
Indian Larsen & Toubro Heavy Engineering + Gulf Saudi Binladin / Six Construct + Filipino marine pools route through RD 150/2023 + Convenio Trabajo Mar + STCW + EN 1090 audit-grade chain-of-custody against Iberdrola, Acciona Energía, Saitec, Sener, or Navantia scopes.