Skip to main content
GERMANY · MARINE / OFFSHORE-WIND DELIVERY

BSH Nordlicht I 1,020 MW approval 20 Dec 2024 (DEME 112 foundations), 5.5 GW N-9.1/9.2/9.3 area suitability 20 Feb 2024, DEME Gennaker IAC + Cuxhaven terminal.

German marine + offshore-wind delivery workforce against DEME Offshore (Belgian parent active in DE EEZ; Nordlicht I 112 foundations + scour protection contract; Cuxhaven offshore-wind terminal build consortium; Gennaker OWP Baltic inter-array cables), Van Oord Deutschland, Heerema Marine Contractors (NL; Saipem 7000-class crane fleet historically active in DE EEZ), Boskalis Subsea (Royal Boskalis Westminster), and Saipem SpA — BSH Planfeststellungsbeschluss (Windenergie-auf-See-Gesetz WindSeeG) + GWO BST / ART mandatory + OPITO BOSIET/HUET/MIST for crossover crews + AEntG cascade for posted offshore workers.

Request Technical Briefing
20 Dec 2024 BSH Nordlicht I approval
1,020 MW Nordlicht I Largest in DE EEZ
5.5 GW Feb 2024 N-9.1/9.2/9.3 area suitability
GWO BST + ART Offshore-wind safety standard

Regulator exposure profile

  • BSH + WindSeeG + Planfeststellung28%
  • GWO BST/ART + OPITO BOSIET26%
  • §14 AEntG + LkSG offshore cascade24%
  • EU MSP + BG Verkehr22%

Named projects in this jurisdiction

  • Nordlicht I (BSH Planfeststellungsbeschluss issued 20 December 2024; 1,020 MW capacity — currently largest in German EEZ; DEME contracted for transport + installation of 112 foundations + scour protection) BSH + DEME Offshore + Vattenfall (developer) 2024
  • North Sea N-9.1/9.2/9.3 area suitability declared by BSH 20.02.2024 — 5,500 MW potential capacity BSH 2024
  • Gennaker OWP Baltic Sea (DEME inter-array cables install) DEME Offshore
  • Cuxhaven offshore-wind terminal (DEME-led consortium build announced 2024) DEME-led consortium 2024

German marine / offshore-wind delivery centres on DEME Offshore (Nordlicht I 112 foundations + Cuxhaven terminal + Gennaker IAC), Van Oord DE, Heerema MC, Boskalis Subsea, and Saipem. BSH approval Nordlicht I 1,020 MW Dec 2024 + N-9.1/9.2/9.3 area suitability 5.5 GW Feb 2024. GWO BST/ART + WindSeeG govern.

01. Pre-pricing — IG Metall offshore + GWO BST

Offshore workforce under IG Metall (mechanical/electrical) + GWO BST/ART certification per offshore-wind crew. SOKA-BAU N/A for offshore scope.

02. A1 + German-language contract + WindSeeG documentation

A1 + German-language contract predate site arrival. BSH Planfeststellungsbeschluss compliance per offshore project (Nordlicht I, Gennaker, Cuxhaven terminal).

03. BSH + BG Verkehr onboarding

BSH approval verification per site. BG Verkehr Berufsgenossenschaft Verkehrswirtschaft Post-Logistik Telekommunikation accident insurance per offshore crew.

04. FKS + Hauptzollamt-defensible evidence pack

Minimum pack: Germany-bank-traceable remuneration, German-language contract, A1 receipt, IG Metall tariff reconciliation, GWO BST + ART + (where applicable) OPITO BOSIET/HUET/MIST training record per offshore worker.

05. India and Gulf sourcing corridors — the Germany marine/offshore-wind pathway

Indian Larsen & Toubro Offshore Heavy Engineering + Gulf ADNOC offshore EPC pools. The 8 to 14-week corridor delivers GWO + WindSeeG-eligible candidates against DEME Nordlicht I scope, Cuxhaven terminal, or Gennaker Baltic IAC.

Same application, other jurisdictions

Scope your Germany Marine / Offshore-Wind Delivery engagement.

Request a Technical Briefing