Skip to main content
SPAIN · HYPERSCALE DC DELIVERY

Microsoft Madrid Oct 2024 GA + AWS Aragón 16 Nov 2022 + Google Madrid May 2022 + Acciona ANA + Ferrovial FER + AECOM, PERTE Chip EUR 12.25 bn + 24 May 2022.

Spanish hyperscale data-centre delivery workforce against Acciona S.A. Acciona Construcción (IBEX 35 ANA; DC construction track record turnkey shells + fit-out), Ferrovial SE Ferrovial Construcción (Euronext Amsterdam + BME FER; building works for tech occupiers), AECOM Spain (Spanish subsidiary of AECOM NYSE ACM; A&E and project management), NTT Global Data Centers (Iberia operations owner-operator; expanding Madrid campus San Sebastián de los Reyes), Equinix Inc. (Nasdaq EQIX; Madrid sites MD1 MD2 MD3 Alcobendas / San Blas; Italy colocation USD 610 m 2024 ref), Microsoft (Nasdaq MSFT; Madrid Cloud Region went live in October 2024 announced GA per Microsoft Azure regional announcements; 4th hyperscaler region in Spain after AWS Aragón November 2022 + Google Madrid May 2022; Oracle also operates Madrid region), and Indra Sistemas S.A. (IBEX 35 IDR; systems integration not core DC civils but referenced for IT-stack delivery on Spanish public-sector DCs) — Microsoft Madrid cloud region (announced February 2020; originally targeted 2022; ultimately launched October 2024 in Madrid metropolitan area per Microsoft news center Spain cloud region announcement) + AWS Aragón region eu-south-2 (went live 16 November 2022 per AWS regional services page) + Google Cloud Madrid region (launched May 2022 per Google Cloud blog Madrid region now open) + PERTE Chip Semiconductor EUR 12.25 bn (approved by Council of Ministers 24 May 2022; includes DC-adjacent compute infrastructure). Ley 9/2017 LCSP for public-sector DC procurement (state cloud) + Reglamento Electrotécnico para Baja Tensión RD 842/2002 + RAT RD 337/2014 for HV/LV electrical installations + RD 1627/1997 site H&S + TPC via FLC for construction phase workforce + Ley 32/2006 subcontracting chain regulation (civil/MEP build phase) + Ley 45/1999 / RD-Ley 7/2021 for European MEP crews + AEPD Agencia Española de Protección de Datos + CCN-STIC standards for sovereign-cloud / public-sector data residency.

Request Technical Briefing
Microsoft Madrid Oct 2024 GA 4th hyperscaler region in Spain
AWS Aragón 16 Nov 2022 eu-south-2 live
Google Madrid May 2022 Cloud region now open
PERTE Chip EUR 12.25 bn 24 May 2022 Council of Ministers

Regulator exposure profile

  • Ley 9/2017 LCSP + AEPD + CCN-STIC22%
  • REBT RD 842/2002 + RAT RD 337/201424%
  • Estatuto ET Art. 42 + REA + TPC28%
  • Ley 45/1999 + RD-Ley 7/202126%

Named projects in this jurisdiction

  • Microsoft Madrid cloud region (announced February 2020; originally targeted 2022; ultimately launched October 2024 in Madrid metropolitan area per Microsoft news center Spain cloud region announcement; 4th hyperscaler region in Spain) Microsoft 2024
  • AWS Aragón region eu-south-2 (went live 16 November 2022 per AWS regional services page; first AWS region in Spain outside Madrid) Amazon Web Services 2022
  • Google Cloud Madrid region (launched May 2022 per Google Cloud blog Madrid region now open) Google Cloud 2022
  • PERTE Chip Semiconductor EUR 12.25 bn (approved by Council of Ministers 24 May 2022; includes DC-adjacent compute infrastructure) + Acciona S.A. (IBEX 35 ANA Acciona Construcción) + Ferrovial SE (FER Ferrovial Construcción) + AECOM Spain (ACM) + NTT Global Data Centers Iberia + Equinix Madrid (EQIX) + Indra Sistemas (IBEX 35 IDR) PERTE Chip + Acciona + Ferrovial + AECOM + NTT + Equinix + Indra

Spanish hyperscale DC: Acciona Construcción (ANA), Ferrovial Construcción (FER + Nasdaq + Euronext Amsterdam), AECOM Spain (ACM), NTT Iberia, Equinix Madrid MD1-MD3 (EQIX), Microsoft Madrid Oct 2024 GA (4th hyperscaler after AWS Aragón Nov 2022 + Google Madrid May 2022 + Oracle), Indra (IDR). PERTE Chip EUR 12.25 bn 24 May 2022. REBT + RAT + LCSP govern.

01. Pre-pricing — VI CGSC + TPC + REBT + RAT

VI CGSC + TPC card per construction worker. REBT RD 842/2002 + RAT RD 337/2014 for HV/LV electrical installations per E&I worker.

02. A1 + TGSS + Cx-cert pre-deployment

TGSS-issued A1 portable document. Ley 45/1999 + RD-Ley 7/2021 posted-worker notification. Hyperscaler Cx-class cert per discipline (Power/Cooling/Network/Security/Fire).

03. ITSS + AEPD + Clasificación de Contratistas onboarding

ITSS enforcement check. AEPD + CCN-STIC compliance for sovereign-cloud / public-sector residency. Clasificación de Contratistas for state-tendered DC scope.

04. ITSS + TGSS-defensible evidence pack

Minimum pack: Spain-bank-traceable remuneration, Spanish-language contract, A1 receipt, REA registration, TPC card per worker, CGSC reconciliation, REBT/RAT competency per E&I worker, Cx-cert per discipline.

05. India and Gulf sourcing corridors — the Spain hyperscale pathway

Indian Larsen & Toubro Mission Critical + Gulf Saudi Binladin / Six Construct hyperscale-DC pools route through LCSP + Estatuto ET Art. 42 + TPC + REBT/RAT audit-grade chain-of-custody against Acciona Construcción, Ferrovial Construcción, AECOM Spain, NTT Iberia, Equinix Madrid, or Indra scopes.

Same application, other jurisdictions

Scope your Spain Hyperscale DC Delivery engagement.

Request a Technical Briefing