Skip to main content
UNITED KINGDOM · HYPERSCALE DC DELIVERY

Mace Microsoft Park Royal £1 bn + PACE 168 MW 3-site, ISG plc administration 19-20 Sep 2024 EY, Skanska UK + Wates Smartspace + Sisk Group.

UK hyperscale DC delivery workforce against Mace Group (private; restructured around data centres + London fit-out April 2026; on-site with £1 bn Microsoft Park Royal data centre West London — construction to early 2026 + PACE / Pathfinder Clean Energy 3-site framework Mace Construct from RIBA Stage 0 168 MW compute capacity across South East + West Midlands + West of England), Sisk Group (John Sisk & Son; UK + Ireland operations), Skanska UK (Skanska AB UK sub), and Wates Smartspace (Wates Group division) — ISG plc EXCLUDED (six UK subsidiaries entered administration 19-20 September 2024; EY appointed Joint Administrators; three DC projects ~£500 m dropped weeks before administration with Yondr re-taking main-contractor role on one). Equinix LD1-LD15 Slough campus ~1.3M sq ft colocation. CDM 2015 + BSA 2022 (HRRB threshold typically not triggered for DC sheds) + Sponsor Licence + Skilled Worker £41,700.

Request Technical Briefing
£1 bn Microsoft Park Royal Mace on-site W London
168 MW 3-site PACE Mace Construct framework
19-20 Sep 2024 ISG plc administration (EY)
CDM 2015 + Uptime Tier III/IV DC commissioning standard

Regulator exposure profile

  • CDM 2015 + BSA 2022 (where HRRB)26%
  • Uptime Institute Tier III/IV24%
  • BAFE/LPS 1014 fire + EnEfG-equivalent24%
  • Sponsor Licence + Skilled Worker26%

Named projects in this jurisdiction

  • Mace Group (private; restructured around data centres + London fit-out April 2026; on-site with £1 bn Microsoft Park Royal data centre West London — construction to early 2026; PACE / Pathfinder Clean Energy 3-site framework Mace Construct from RIBA Stage 0 168 MW compute capacity) Mace Group 2026
  • Sisk Group (John Sisk & Son; UK + Ireland operations) John Sisk & Son
  • Skanska UK (Skanska AB UK sub) + Wates Smartspace (Wates Group division) Skanska UK + Wates Smartspace
  • Equinix LD1-LD15 Slough campus (~1.3M sq ft colocation; LD4/LD5/LD6/LD7 at Slough Trading Estate; LD13x hyperscale; 14 UK Equinix facilities) Equinix Inc.
  • ISG plc EXCLUDED — six UK subsidiaries entered administration 19-20 September 2024 (EY appointed Joint Administrators); 3 DC projects ~£500 m dropped pre-admin with Yondr re-taking main-contractor role on one ISG Ltd (in administration) 2024

UK hyperscale DC delivery: Mace (£1 bn Microsoft Park Royal + PACE 168 MW 3-site), Sisk Group (UK+IE), Skanska UK, Wates Smartspace. ISG plc administration 19-20 Sep 2024 (EY) — 3 DC projects ~£500 m dropped. Equinix LD1-LD15 Slough. CDM 2015 + Uptime Tier III/IV + Sponsor Licence govern.

01. Pre-pricing — CSCS + CIS + Uptime Tier verification

CSCS card per worker. CIS 20%/30%. Uptime Institute Tier III/IV commissioning verification per DC.

02. Sponsor Licence + Skilled Worker + CDM 2015

Sponsor Licence + Skilled Worker £41,700 minimum. CDM 2015 Principal Contractor duties per DC site.

03. HSE + BSA 2022 onboarding

HSE construction inspection. BSA 2022 Gateway compliance where HRRB threshold triggered (typically not for pure DC sheds).

04. HMRC + HSE-defensible evidence pack

Minimum pack: UK-bank-traceable remuneration, English-language CoS + contract, CIS statements, CITB returns, CSCS card, Uptime Institute commissioning record.

05. India and Gulf sourcing corridors — the UK hyperscale-DC pathway

Indian Larsen & Toubro Construction MEP + Gulf hyperscale-DC trades via Saudi Binladin / Arabtec. The 8 to 14-week corridor delivers CSCS + Sponsor Licence-eligible candidates against Mace Microsoft Park Royal, PACE 168 MW 3-site, or Equinix LD-series Slough scopes.

Same application, other jurisdictions

Scope your United Kingdom Hyperscale DC Delivery engagement.

Request a Technical Briefing