Grand Paris Express Lines 14/15/16/17/18 — Soletanche Bachy + Bouygues TP + Eiffage IRIS.

Cross-border deep-foundation workforce mobilisation against Société des Grands Projets (SGP) Grand Paris Express — Line 14 South (Bouygues TP + Soletanche Bachy), Line 15 South T2A + T3A (Bouygues + Soletanche), Line 15 East "IRIS" consortium (Bouygues + Bessac + Soletanche + Egis + Colas Rail + Alstom, €1.087 bn + Eiffage-led €2.54 bn 15-East D&B Dec 2023), 27 Herrenknecht TBMs.

Request Technical Briefing
27 TBMs Herrenknecht fleet GPE-wide
~100 km Tunnel network total
NF P 94-282 Parois moulées execution
€1,843 BTP CCN N1P1 monthly floor 2026

Regulator exposure profile

  • SGP référentiel + Eurocode 728%
  • CIBTP + BTP CCN PC 12426%
  • URSSAF + Décret 2025-133824%
  • CARSAT IDF + OPPBTP + AFTES22%

Named projects in this jurisdiction

  • Grand Paris Express Line 14 South tunnel package (Bouygues TP + Soletanche Bachy) Bouygues TP + Soletanche Bachy
  • GPE Line 15 South T2A + T3A packages (Bouygues + Soletanche) Bouygues TP + Soletanche Bachy
  • GPE Line 15 East "IRIS" consortium (Bouygues + Bessac + Soletanche + Egis + Colas Rail + Alstom, €1.087 bn 15-East-2) IRIS consortium
  • GPE Line 15 East D&B Eiffage-led (€2.54 bn, awarded Dec 2023) Eiffage-led 2023
  • 27 Herrenknecht TBM fleet (23 EPB + 4 Variable-Density, 7.7-9.8 m diameter, ~100 km tunnels) Herrenknecht for SGP

France’s deep-foundation market centres on Grand Paris Express (Société des Grands Projets) — the largest infrastructure project in Europe. Soletanche Bachy, Bouygues TP, Eiffage TP, and the IRIS consortium dominate Line 14 / 15 / 16 / 17 / 18 packages. Herrenknecht supplies the TBM fleet.

01. Pre-pricing — PC 124 BTP + CIBTP

Deep-foundation workforce at PC 124 BTP N1P1 €1,843 monthly floor (2026). CIBTP Congés 20.70% national; Intempéries 0.68% gros œuvre. Where reinforcement-cage welding crosses into EN ISO 9606-1 scope, Convention Métallurgie picks up the metalworking-trade portion.

02. SIPSI + A1 + NF X 46-010 SS3/SS4 (asbestos)

A1 + French-language contract + SIPSI déclaration predate site arrival. The asbestos layer triggers per-site where pre-1980 fill is encountered (common in Île-de-France): NF X 46-010 SS3/SS4 competency on affected crews, DUERP-Amiante documentation. CARSAT Île-de-France + OPPBTP H&S oversight.

03. CIBTP + Constructys + AFTES onboarding

Civil-trade portion at CIBTP 20.70%. AFTES tunnel-trade competency where applicable.

04. URSSAF + DREETS-defensible evidence pack

Standard FR profile + SGP framework-agreement reconciliation. Minimum pack: SEPA-traceable remuneration, SIPSI, Carte BTP, A1, NF X 46-010 SS3/SS4 record where asbestos-encountered, AFTES competency per tunnel-trade worker.

05. India and Gulf sourcing corridors — the FR deep-foundation pathway

Indian deep-foundation pool delivers L&T-trained bored-pile rig operators + Gammon India diaphragm-wall crews. Gulf corridor reaches Bauer Middle East / Saudi Binladin foundation pools.

The 8 to 14-week corridor lead-time activates against the SGP Lines 14 / 15 / 16 / 17 / 18 packages.