FRANCE · BIOMASS & WASTE-TO-ENERGY ERECTION

Ivry-Paris XIII, Sénerval Strasbourg, Antares Halluin — Arrêté 20 septembre 2002 + IED.

Cross-border WtE workforce mobilisation against TIRU/Suez Ivry-Paris XIII (~700,000 t/y, since 2011), Sénerval Strasbourg (Séché Environnement, 85 GWh district heating + 185 GWh industrial steam) and Antares Halluin (Veolia 65% / Idex 35% JV Covalys, up to 350,000 t/y) — Arrêté du 20 septembre 2002 + IED 2010/75/EU + BREF WI.

Request Technical Briefing
~700kt/y Ivry-Paris XIII throughput
650 GWh Antares Halluin annual output
IED 2010/75 Industrial Emissions Directive
€1,843 BTP CCN N1P1 monthly floor 2026

Regulator exposure profile

  • Arrêté 20 sept 2002 + IED + WI BREF28%
  • EN 12952 + CODAP/CODETI + PED26%
  • URSSAF + Décret 2025-133824%
  • ADEME Fonds Chaleur (district heating)22%

Named projects in this jurisdiction

  • Ivry-Paris XIII WTE (Suez since 2011, ~700,000 t/y, ~63 MW, heat to CPCU) SUEZ
  • Sénerval Strasbourg (Séché Environnement, 85 GWh district heating + 185 GWh industrial steam to Port Autonome) Sénerval / Séché Environnement
  • Antares Halluin (Veolia 65% / Idex 35% JV Covalys, up to 350,000 t/y, 650 GWh/y to Roubaix + Lille networks) Covalys (Veolia + Idex JV)

France’s WtE fleet operates under Arrêté du 20 septembre 2002 (incineration installations) + ICPE rubriques 2771 / 2790. Headline named plants: Ivry-Paris XIII (Suez), Sénerval Strasbourg (Séché Environnement), Antares Halluin (Veolia + Idex). ADEME’s Fonds Chaleur underwrites district-heating offtake.

01. Pre-pricing — PC 124 BTP + Convention Métallurgie split

Pressure-part welding sits under Convention Collective de la Métallurgie. Civil shell — boiler-house steel, ash silos, flue-gas towers — sits under PC 124 BTP at N1P1 €1,843 monthly floor. CIBTP Congés 20.70%.

02. SIPSI + A1 + PED Cat III/IV + CODAP / CODETI documentation

A1 + French-language contract + SIPSI déclaration predate site arrival. PED Cat III/IV scope requires the notified-body records (Bureau Veritas, APAVE, SOCOTEC) linked to the installed pipework. CODAP 2020 + CODETI apply alongside EN 12952 / EN 13480.

03. CIBTP + DREAL onboarding

Civil-trade portion at CIBTP 20.70%. DREAL regional inspection on ICPE compliance (e.g. DREAL Île-de-France for Ivry, DREAL Grand Est for Strasbourg, DREAL Hauts-de-France for Halluin).

04. URSSAF + DREAL-defensible evidence pack

Standard FR profile + IED emissions audit cascading into contractor file requirements. Minimum pack: SEPA-traceable remuneration, SIPSI, Carte BTP, A1, WPQR scope-match file, CODAP / CODETI conformity records.

05. India and Gulf sourcing corridors — the FR WtE pathway

Indian pressure-part welder pool delivers EN ISO 9606-1 + ASME IX qualified trades through BHEL, L&T, Tata Power. Gulf corridor reaches ARAMCO / ADNOC NORSOK pools.

The 8 to 14-week corridor activates against Ivry-Paris XIII, Sénerval Strasbourg or Antares Halluin.