Janssen Beerse (J&J Innovative Medicine), Pfizer Puurs, GSK Wavre/Rixensart, UCB Braine-l\'Alleud.
Cross-border GMP fit-out workforce mobilisation against Janssen Pharmaceutica Beerse (J&J Innovative Medicine major site), Pfizer Puurs (included in BioNTech-Pfizer COVID-19 vaccine production), GSK Wavre / Rixensart (major vaccines site), UCB Braine-l\'Alleud (Belgian HQ + biotech manufacturing), and Takeda Lessines — FAGG/AFMPS, EU GMP Annex 1 (2022).
Request Technical BriefingRegulator exposure profile
- FAGG/AFMPS + EU GMP Annex 130%
- BELAC + ISO 1464424%
- Limosa-L + §30bis + SIOD22%
- Constructiv + PC 124 + PC 111/20924%
Pressure-cascade direction is the proof.
EU GMP Annex 1 (2022) positive-pressure cascade A → B → C → D. FAGG/AFMPS verifies cascade direction at on-site inspections; ISO 14644 particle counts; VLAREM II Title 5.20 (Flanders) for solvents.
▲ Grade A · +30 Pa (Pfizer Puurs / GSK Wavre fill)
- A fulfilled
Aseptic processing
- +30 Pa target
- ISO Class 5 in-operation
- Microbial < 1 CFU/m³
- B fulfilled
Surrounding Grade A
- +15 Pa target
- ISO Class 7 in-operation
- C partial
Clean preparation
- +5 Pa target
- D unfulfilled
Support
- Ambient
▼ Grade D · ambient
Named projects in this jurisdiction
- Janssen Pharmaceutica Beerse (J&J Innovative Medicine major site) Johnson & Johnson Innovative Medicine
- Pfizer Puurs (BioNTech-Pfizer COVID-19 vaccine production) Pfizer
- GSK Wavre / Rixensart (major vaccines site) GSK
- UCB Braine-l'Alleud (Belgian HQ + biotech manufacturing) UCB
- Takeda Lessines + Catalent Brussels Takeda / Catalent
Belgium’s pharma cluster is large by global standards — Janssen Beerse, Pfizer Puurs (the BioNTech-Pfizer COVID-19 vaccine production site), GSK Wavre, UCB Braine-l’Alleud, Takeda Lessines, Catalent Brussels. FAGG/AFMPS holds federal manufacturing authorisation.
01. Pre-pricing — PC 111/209 + PC 124 split
Process workforce under PC 111 / 209 metal-trade CBAs. Civil shell at PC 124 BTP.
02. Limosa-L + A1 + GMP Annex 1 + FAGG documentation
A1 + Dutch/French-language contract + Limosa-L predate site arrival. FAGG-recognised gowning per Grade A/B worker.
03. §30bis + Constructiv + essenscia onboarding
Sub-contractor §30bis withholding. Constructiv enrolment. essenscia framework for chemicals/pharma scope.
04. SIOD + FAGG-defensible evidence pack
Minimum pack: SEPA-traceable remuneration, language-appropriate contract, Limosa-1 receipt, RSZ-ONSS DmfA, FAGG-recognised gowning record per individual.
05. India and Gulf sourcing corridors — the BE GMP pathway
Indian and Gulf pharma-trade pools. The 8 to 14-week corridor delivers Grade-A-eligible candidates against Janssen, Pfizer Puurs, GSK Wavre, or UCB.