NORWAY · CIVIL MEGA-PROJECT PRIME

Veidekke ASA VEI E134 NOK 5.4 bn + AF Gruppen AFG + Hæhre NOK 3.95 bn E6 + Skanska Norge + NCC Norge + Implenia Norge, FOR-2024-10-21-2544 byggfag allmenngjøring 1 Nov 2024.

Norwegian civil mega-project prime workforce against Veidekke ASA (Oslo Børs VEI; largest Norwegian-headquartered contractor), AF Gruppen ASA (Oslo Børs AFG; diversified contractor + environmental + demolition), Hæhre Entreprenør AS (private; Hæhre & Isachsen Gruppen; heavy civils), Skanska Norge AS (Skanska AB Stockholm SKA-B subsidiary), NCC Norge AS (NCC AB Stockholm NCC-B subsidiary), and Implenia Norge AS (Implenia AG SIX IMPN tunnelling specialist) — Veidekke E134 Oslofjord Connection Phase 2 (Statens Vegvesen design-and-build NOK 5.4 bn excl. VAT; 14 km Frogn-Asker; new 7.4 km Oslofjord Tunnel tube + 1.6 km Frogn Tunnel + 370 m Vassum Tunnel — "largest contract ever awarded to Veidekke") + Hæhre E6 Ranheim-Sveberg Trøndelag (Nye Veier AS NOK 3.95 bn excl. VAT; execution-phase signed 25 June 2025; 12.5 km incl. 1.7 km Værtunnel; traffic summer 2027) + Skanska-Syltern E6 Berkåk-Vindåsliene (Skanska NOK 1.3 bn; NCC asphalt sub) + Veidekke Drammen-Kobbervikdalen (Bane NOR Vestfoldbanen NOK 1.83 bn + NOK 1.96 bn rock tunnel Strømsåsen) + Skanska Fornebubanen Skøyen station (NOK 1.7 bn SEK 1.6 bn Q2 2025 Nordic order intake; construction start Sep 2025 completion 2029) + Implenia Norge Fornebubanen K2A Lysaker-Fornebu tunnel ~NOK 1.2 bn CHF 131 m + K2D Skøyen-Vækerø ~NOK 1.3 bn CHF 115 m. Allmenngjøringsloven (Act 4 June 1993 No. 58) + Forskrift om delvis allmenngjøring av tariffavtale for byggeplasser i Norge FOR-2024-10-21-2544 in force 1 November 2024 amended 15 June 2025 + Arbeidsmiljøloven §14-12 c solidaransvar + Innleielov tightening from 1 April 2023 + A-krimsentre 8 cities + Skatteetaten + Arbeidstilsynet + NS-EN 1090-2:2018+A1:2024.

Request Technical Briefing
Veidekke E134 NOK 5.4 bn Largest Veidekke contract ever
Hæhre E6 NOK 3.95 bn Nye Veier 25 Jun 2025
FOR-2024-10-21-2544 Byggfag allmenngjøring 1 Nov 2024
§14-12 c solidaransvar AML innleier joint liability

Regulator exposure profile

  • Allmenngjøringsloven 1993 No. 5828%
  • FOR-2024-10-21-2544 byggfag26%
  • §14-12 c + innleielov 2023-202424%
  • A-krimsentre + Arbeidstilsynet22%

Named projects in this jurisdiction

  • Veidekke E134 Oslofjord Connection Phase 2 (Statens Vegvesen design-and-build contract; NOK 5.4 bn excl. VAT — "largest contract ever awarded to Veidekke"; 14 km Frogn-Asker + new 7.4 km Oslofjord Tunnel tube + 1.6 km Frogn Tunnel + 370 m Vassum Tunnel) Veidekke ASA (VEI) / Statens Vegvesen
  • Hæhre E6 Ranheim-Sveberg Trøndelag (Nye Veier AS counterparty; collaboration-phase agreement 2 July 2024; execution-phase signed 25 June 2025; NOK 3.95 bn excl. VAT; 12.5 km incl. 1.7 km Værtunnel; ready for traffic summer 2027) Hæhre Entreprenør AS / Nye Veier AS 2025
  • Veidekke Drammen-Kobbervikdalen (Bane NOR Vestfoldbanen; soil/concrete-tunnel NOK 1.83 bn excl. VAT + 6 km rock tunnel Strømsåsen NOK 1.96 bn) + Skanska Fornebubanen Skøyen station (NOK 1.7 bn SEK 1.6 bn Q2 2025 Nordic order intake; construction start Sep 2025 completion 2029) Veidekke + Skanska Norge
  • Implenia Norge Fornebubanen K2A Lysaker-Fornebu tunnel ~NOK 1.2 bn / CHF 131 m + K2D Skøyen-Vækerø ~NOK 1.3 bn / CHF 115 m + Skanska-Syltern E6 Berkåk-Vindåsliene Skanska NOK 1.3 bn + NCC asphalt sub 200,000 t Implenia Norge + Skanska-Syltern + NCC

Norwegian civil-mega prime: Veidekke (VEI; E134 NOK 5.4 bn), AF Gruppen (AFG), Hæhre (E6 NOK 3.95 bn Jun 2025), Skanska Norge, NCC Norge, Implenia Norge. Allmenngjøringsloven + FOR-2024-10-21-2544 (1 Nov 2024) + §14-12 c solidaransvar + A-krim 8 cities govern.

01. Pre-pricing — Fellesoverenskomsten byggfag + fagbrev

Fellesoverenskomsten for byggfag 2024-2026 wage floor per worker. Skilled-worker rate gated on Norwegian-recognised fagbrev/vocational craft certificate (forskrift FOR-2024-10-21-2544).

02. A1 + Norwegian-language contract + innleielov compliance

A1 portable document per posted worker. Norwegian-language contract. Innleielov tightening 1 April 2023 + Oslo/Viken/Vestfold construction restrictions per scope.

03. Skatteetaten + Arbeidstilsynet + A-krim onboarding

Skatteetaten registration + RF-1199 / OTP / A-melding reporting. Arbeidstilsynet right-to-work + posted-worker terms. A-krimsentre 8 cities joint enforcement risk.

04. Skatteetaten + Arbeidstilsynet-defensible evidence pack

Minimum pack: Norway-bank-traceable remuneration, Norwegian-language contract, A1 receipt, Fellesoverenskomsten byggfag reconciliation, fagbrev recognition attestation per worker, §14-12 c solidaransvar attestation.

05. India and Gulf sourcing corridors — the Norway civil-prime pathway

Indian Larsen & Toubro Heavy Civil + Gulf Saudi Binladin / Six Construct pools route through Allmenngjøring + §14-12 c + fagbrev recognition + A-krim audit-grade chain-of-custody against Veidekke, AF Gruppen, Hæhre, Skanska Norge, NCC Norge, or Implenia Norge scopes.