Webuild WBD FY24 EUR 12 bn +20% backlog EUR 63.2 bn + Pizzarotti + Astaldi + Salcef SCF, Messina Bridge EUR 10.6 bn (CIPESS Aug 2025 + CoA Oct 2025) + Genoa Bridge + Naples-Bari HSR.
Italian civil mega-project prime workforce against Webuild S.p.A. (Borsa Italiana WBD MIB ESG; FY2024 revenue EUR 12.0 bn +20% YoY; construction backlog EUR 54 bn; total order backlog EUR 63.2 bn; new orders EUR 13 bn 2024; successor to Salini Impregilo absorbed Astaldi 65% via Progetto Italia November 2020 EUR 225 m capital increase concordato preventivo exit; group >70,000 employees 50 countries), Astaldi (Webuild subsidiary since November 2020), Pizzarotti & C. S.p.A. (privately held Parma-based prime; JV contractor with Webuild on Naples-Bari HSR Orsara-Hirpinia 70:30 consortium), Salcef Group S.p.A. (Borsa Italiana SCF Euronext STAR; track/rail-infra prime active in civil works), Itinera S.p.A. (Gavio Group / ASTM listed; civil mega-prime), and Webuild absorbed Astaldi via Progetto Italia — Messina Strait Bridge (Stretto di Messina S.p.A. concessionaria; contract addendum with Eurolink consortium led by Webuild valued EUR 10.6 bn; overall project value EUR 13.5 bn; CIPESS approved definitive design August 2025; Court of Audit declined to validate CIPESS resolution 29 October 2025 delaying construction start; works road/rail links scheduled May 2026 + tunnels/interchanges Phase 3 September 2026) + Genoa San Giorgio Bridge post-Morandi (PERGENOVA consortium — Webuild + Fincantieri Infrastructure + Italferr; construction 25 June 2019 → opened to traffic 4 August 2020; ~1,000 workers 40 trades) + Naples-Bari HSR Orsara-Hirpinia (Webuild/Pizzarotti 70:30 EUR 1.075 bn; prior Orsara-Bovino 11.8 km EUR 367.2 m; earlier Webuild-Astaldi EUR 397 m; total Webuild Naples-Bari ~US$1.75 bn) + Rome Metro Line C (Webuild + Vianini Lavori for Roma Metropolitane / Roma Capitale; Venezia Station diaphragm-wall first phase one of Europe's deepest stations). D.Lgs. 36/2023 Codice dei contratti pubblici (replaced D.Lgs. 50/2016 from 1 July 2023; corrective decree D.Lgs. 209/2024 in force from 31 December 2024; mandates digital procurement via PDND / BDNCP) + Codice Civile Art. 1676 (direct action by contractor's employees against principal up to sums owed) + D.Lgs. 276/2003 Art. 29 (principal jointly + severally liable with contractor + subcontractors for wages + severance + INPS + INAIL within 2 years of works completion) + D.Lgs. 136/2016 (implementing Dir. 2014/67/EU; UNI_Distacco_UE notification via Ministero del Lavoro portal before D-1; amended by D.Lgs. 122/2020) + CCNL Edilizia (renewed 21 February 2025 — ANCE + Fillea/Filca/Feneal valid to 30 June 2028; +EUR 180 minimum on Level 1) + Cassa Edile / CNCE (mandatory registration for all blue-collar construction workers regardless of posting duration) + ANAC + MIT + Italferr standards + RFI Capitolato + PNRR EUR 191.5 bn RRF + EUR 30.6 bn Complementary Fund (72.2% drawn EUR 140.4 bn by 2026; all milestones close by August 2026).
Request Technical BriefingRegulator exposure profile
- D.Lgs. 36/2023 + ANAC BDNCP26%
- Codice Civile Art. 1676 + 276/03 Art. 2928%
- CCNL Edilizia 2025-2028 + Cassa Edile24%
- D.Lgs. 136/2016 + UNI_Distacco_UE22%
Italian civil-mega prime cascade exposure axes.
Italian civil-mega prime matrix against Webuild / Astaldi / Pizzarotti / Salcef / Itinera × D.Lgs. 36/2023 + Codice Civile Art. 1676 + D.Lgs. 276/2003 Art. 29 + ANAC + MIT + Cassa Edile.
| Webuild | Astaldi (Webuild) | Pizzarotti | Salcef | Itinera (ASTM) | |
|---|---|---|---|---|---|
| D.Lgs. 36/2023 + ANAC BDNCP | covered | covered | covered | covered | covered |
| Codice Civile Art. 1676 | covered | covered | covered | covered | covered |
| D.Lgs. 276/2003 Art. 29 (2yr) | covered | covered | covered | covered | covered |
| Cassa Edile + CCNL Edilizia 2025 | covered | covered | covered | covered | covered |
- In-scope
- Conditional
- Tightening
- Out of scope
D.Lgs. 276/2003 Art. 29 — principal jointly + severally liable with contractor + subcontractors for wages + severance + INPS + INAIL within 2 years of works completion. PNRR August 2026 hard deadline.
Named projects in this jurisdiction
- Messina Strait Bridge (Stretto di Messina S.p.A. concessionaria signed contract addendum with Eurolink consortium led by Webuild valued at EUR 10.6 bn; overall project value EUR 13.5 bn; CIPESS approved definitive design August 2025; Court of Audit declined to validate CIPESS resolution 29 October 2025 delaying construction start; works road/rail links scheduled May 2026 + tunnels/interchanges Phase 3 September 2026) Stretto di Messina + Eurolink/Webuild 2025
- Genoa San Giorgio Bridge post-Morandi (PERGENOVA consortium — Webuild + Fincantieri Infrastructure + Italferr; construction 25 June 2019 → opened to traffic 4 August 2020; ~1,000 workers 40 trades) PERGENOVA / Webuild + Fincantieri + Italferr 2020
- Naples-Bari HSR Orsara-Hirpinia (Webuild/Pizzarotti 70:30 consortium; Italferr/RFI client; EUR 1.075 bn for 28 km section; prior Orsara-Bovino 11.8 km EUR 367.2 m; earlier Webuild-Astaldi EUR 397 m; total Webuild Naples-Bari ~US$1.75 bn) + Rome Metro Line C (Webuild + Vianini Lavori for Roma Metropolitane / Roma Capitale) Italferr/RFI + Webuild + Pizzarotti + Vianini
- Webuild S.p.A. (Borsa Italiana WBD MIB ESG; FY24 EUR 12 bn +20%) + Astaldi (Webuild sub since Nov 2020) + Pizzarotti & C. (Parma private) + Salcef Group (SCF Euronext STAR) + Itinera (Gavio Group / ASTM listed) Webuild + Astaldi + Pizzarotti + Salcef + Itinera
Italian civil-mega prime: Webuild (WBD; FY24 EUR 12 bn +20% / backlog EUR 63.2 bn / absorbed Astaldi Nov 2020), Astaldi (Webuild sub), Pizzarotti (Parma private), Salcef (SCF), Itinera (ASTM). Messina Bridge EUR 10.6 bn (CIPESS Aug 2025; CoA refused 29 Oct 2025) + Genoa San Giorgio (2020) + Naples-Bari HSR EUR 1.075 bn + Rome Metro C. D.Lgs. 36/2023 + Civil Code Art. 1676 + 276/03 Art. 29 + Cassa Edile govern. PNRR Aug 2026 deadline.
01. Pre-pricing — CCNL Edilizia 2025-2028 + Cassa Edile
CCNL Edilizia (renewed 21 February 2025 to 30 June 2028; +EUR 180 minimum on Level 1) per worker. Cassa Edile / CNCE mandatory registration for blue-collar workers regardless of posting duration.
02. A1 + UNI_Distacco_UE + Italian-language contract
A1 portable document per posted worker. UNI_Distacco_UE notification via Ministero del Lavoro portal before D-1. Italian-language contract.
03. INPS + INAIL + ANAC onboarding
INPS social security + INAIL accident insurance. ANAC BDNCP supervision (~60M contracts ~EUR 2.25 trillion over 10y). MIT/RFI/Italferr standards per project.
04. INPS + ITSS-defensible evidence pack
Minimum pack: Italy-bank-traceable remuneration, Italian-language contract, A1 receipt, UNI_Distacco_UE receipt, Cassa Edile registration, CCNL Edilizia reconciliation, Art. 1676 + Art. 29 attestation per worker.
05. India and Gulf sourcing corridors — the Italy civil-prime pathway
Indian Larsen & Toubro Heavy Civil + Gulf Saudi Binladin / Six Construct pools route through D.Lgs. 36/2023 + Art. 1676 + Art. 29 + CCNL Edilizia + Cassa Edile audit-grade chain-of-custody against Webuild, Astaldi, Pizzarotti, Salcef, or Itinera scopes.