ITALY · SEMICONDUCTOR FAB CONSTRUCTION

STMicroelectronics Catania SiC €5 bn / €2 bn State aid Jun 2024, Silicon Box Novara €3.2 bn / €1.3 bn State aid Dec 2024, STM Agrate 300 mm Si expansion.

Cross-border semiconductor-fab workforce mobilisation against STMicroelectronics Catania SiC Campus (€5 bn total investment; €2 bn Italian State aid under EU Chips Act per Commission Decision IP/24/2994 June 2024; world's first fully integrated 200 mm SiC facility; production start 2026; full ramp 15,000 wafers/week by 2033), Silicon Box Novara Piedmont (Singapore-HQ; €3.2 bn total; €1.3 bn Italian State aid EC approval December 2024; Europe's first advanced packaging + chiplet integration facility; construction starts H2 2025; production starts 2028; 1,600 high-skilled jobs), and STMicroelectronics Agrate Brianza Milan-area existing 300 mm Si fab with October 2024 strategic announcement to accelerate 300 mm Si wafer fab capacity at Agrate alongside SiC at Catania — EU Chips Act Regulation (EU) 2023/1781 + D.Lgs. 81/2008 + ARPA Sicilia/Piemonte.

Request Technical Briefing
€5 bn / €2 bn aid STM Catania SiC Jun 2024
€3.2 bn / €1.3 bn aid Silicon Box Novara Dec 2024
15,000 wafers/wk STM Catania full ramp 2033
EU Chips Act Regulation (EU) 2023/1781

Regulator exposure profile

  • EU Chips Act 2023/1781 + IP/24/299428%
  • CCNL Edilizia + Cassa Edile24%
  • D.Lgs. 81/2008 + ISO 1464426%
  • ARPA Sicilia + Piemonte permits22%

Named projects in this jurisdiction

  • STMicroelectronics Catania SiC Campus (€5 bn total investment; €2 bn Italian State aid under EU Chips Act per Commission Decision IP/24/2994 June 2024; world's first fully integrated 200 mm SiC facility; production start 2026; full ramp 15,000 wafers/week by 2033) STMicroelectronics 2024
  • Silicon Box Novara Piedmont (Singapore-HQ; €3.2 bn total; €1.3 bn Italian State aid EC approval December 2024; Europe's first advanced packaging + chiplet integration facility; construction starts H2 2025; production starts 2028; 1,600 high-skilled jobs) Silicon Box 2024
  • STMicroelectronics Agrate Brianza Milan-area (existing 300 mm Si fab; October 2024 strategic announcement to accelerate 300 mm Si wafer fab capacity alongside SiC at Catania) STMicroelectronics

Italy’s semiconductor cluster runs through STMicroelectronics Catania SiC (€5 bn, €2 bn State aid Jun 2024) + Silicon Box Novara advanced packaging (€3.2 bn, €1.3 bn State aid Dec 2024) + STM Agrate Brianza 300 mm Si expansion. EU Chips Act Regulation (EU) 2023/1781 anchors funding.

01. Pre-pricing — CCNL Edilizia + SEMI S2

Cleanroom-fitter workforce under CCNL Edilizia + regional Cassa Edile. SEMI S2 + S8 equipment-safety competency for cleanroom work.

02. A1 + Italian-language contract + EU Chips Act State-aid documentation

A1 + Italian-language contract predate site arrival. EU Chips Act IP/24/2994 (Catania) + EC Dec 2024 approval (Novara) State-aid reconciliation per facility.

03. ARPA + STM / Silicon Box gowning onboarding

ARPA Sicilia (Catania) + ARPA Piemonte (Novara) permits. STM or Silicon Box operator-specific internal-gowning qualification per cleanroom worker.

04. Ispettorato + INAIL-defensible evidence pack

Minimum pack: Italy-bank-traceable remuneration, Italian-language contract, A1 receipt, CCNL Edilizia tariff reconciliation, gowning record per worker.

05. India and Gulf sourcing corridors — the Italy semi pathway

Indian semiconductor-trade pool through IIW cleanroom-fitters + BHEL controls. The 8 to 14-week corridor delivers Class-1-eligible candidates against STM Catania SiC ramp or Silicon Box Novara construction.