Screening.
Engineered.
Explore the System The industry standard
doesn't screen.
deviate from expectations
across the industry
fabrication detection
Observe
Six to eight hours of structured observation under realistic working conditions. Multiple independent observation methods operating simultaneously. Candidates cannot sustain a fabricated performance profile across the full assessment window.
Assess
1308 trade-specific rubrics producing calibrated dimensional profiles — not binary pass/fail. Trade-country specific. Jurisdiction-calibrated. Every profile carries quantified confidence levels for each performance dimension.
Calibrate
Every deployment outcome refines every future assessment. On-site performance correlation with screening predictions identifies systematic gaps. The system improves with each cycle. Self-correcting by architecture.
What 20 Minutes
Cannot Cover
What the Industry Calls
"Screening"
- Roof geometry: hip/valley layout, compound angles, jack rafter calculation — 20% weight
- Joinery precision: mortise, lap, dovetail — gap tolerance <2mm
- 3 practical tests: jack rafter cut (90 min), Gerber scarf joint (90 min), airtightness detail (45 min)
- 30-question exam: Eurocode 5, building physics, GEG energy standards
- Language: B1 German + trade vocabulary (Pfette, Sparren, Dampfbremse)
- Culture: "A man, a word" — reliability as measurable dimension
- FCAW technique across 4 positions: 3G vertical, 4G overhead — NDT weighted at 50%
- Ceramic backing root run: one-sided welding on 20mm hull plate
- Carbon arc gouging: clean U-groove, zero carbon contamination
- Confined space protocol: Gas Free cert, sentry confirmation, 15-in/15-out rotation
- Stop/restart technique: zero porosity at weld transitions
- IACS Class Approval awareness: Lloyd's Register, DNV, Bureau Veritas
- 5 Safety Rules recitation: Freischalten → Abdecken — mandatory, zero exceptions
- Star-Delta motor starter: 3 contactors, electrical interlocking, 90 min timed build
- VDE 0100-600 testing: R-PE, R-ISO at 500V DC, RCD trip time, loop impedance
- Black box troubleshooting: systematic voltage tracing from source to fault
- 30-question exam: cable sizing, breaker curves (B/C/K), installation zones
- Cabinet standard: 90° bends, ferrule crimping, EMC-compliant routing
Trade-Specific Intelligence
Screened. Compliant.
On Site.
Chain liability enforcement. Every contractor in the subcontractor chain liable for compliance violations. Zero tolerance from Zoll (Customs).
VCA safety certification mandatory for all site personnel. Labour market test required for non-EU workers. Collective agreement wages enforced.
Offshore platform deployment. NORSOK welding standards exceed onshore. Confined space protocols mandatory. Medical fitness screening required.
- Strong process piping technique — isometric reading verified
- B1 German developing — trade vocabulary adequate for site communication
- Soka-Bau documentation complete — zero compliance gaps identified
- No fabrication indicators detected across observation window
Explore the System
— "The industry treats screening failure as a quality problem — hire better recruiters, ask better questions. It is not a quality problem. It is a structural problem. The methods themselves are incapable."